Laserfiche WebLink
Phase 1: 2018 <br /> Construction of new fumigation chamber. Size of building will be 12'x 60'. Eave height <br /> of 14'. 720 square feet. <br /> Building addition of 30' x 100' roof only. 3000 sq ft <br /> Construction of new silo for the purposes of storing walnut shell. 50' round by 35' high. <br /> Installation of a bio energy site to produce electricity from the shell waste. No <br /> constructed buildings in this area. Energy units will all be modular. 120'x 240' area. <br /> Phase 2: 2019 <br /> Construction of building addition to be used for cold storage. 21,528 sq ft. Building will <br /> store finished goods <br /> Construct new restroom facility, proposed 8x32' 256 sq ft <br /> Phase 3 2020 <br /> Construction of new storage building. Dimensions of 100' x 400'with a 27' eave height. <br /> Building will be used to storage inshell walnuts. <br /> Phase 4 2021 <br /> Construction of new 140'x 40' roof only. 25' eave height. This building will be used to <br /> cover new walnut hulling line. <br /> Construction of building addition of 120' x 80' for Ag Storage. <br /> Phase 5 2024 <br /> Construction of new 600' x 100'warehouse. 25' Eave height. Building will be used for <br /> storage of raw inshell walnuts. 60,000 sq ft <br /> Building Addition of 200'x 100' cold storage facility. 20,000 sq ft <br /> Construction of new 12'x 60'fumigation chamber. 720 sq ft <br /> Phase 6 2026 <br /> Construction of new 600'x 100' warehouse. 25' Eave height. Building will be used for <br /> storage of raw inshell walnuts. 60,000 sq ft. <br /> Phase 7 2027 <br /> Construction of new 600'x 100' warehouse. 25' Eave height. Building will be used for <br /> storage of raw inshell walnuts. 60,000 sq ft. <br />