Laserfiche WebLink
UNIT IV LOP <br /> LTCP NO FURTHER ACTION (NFA) CLOSURE CHECK LIST <br /> 8/22113 /01 q1 Zol 3 <br /> SITE ADDRESS: 6?�2 C -��`'`� ? 0V DATE: <br /> SITE NAME: ✓tD LOP STAFF: <br /> REQUEST FOR CLOSURE(AKA NFA) uploaded into GT by RP/consultant, within 60 days LOP staff reviews and <br /> receives ESI with link to regulator's response in GT. If Staff verifies site meets LTCP closure criteria, then gain <br /> PG's concurrence. On PG saved LTCP check list as"FINAL","READY FOR CLOSURE" in GT. <br /> LOP staff provides list of sites for PG to advise CVRWQCB of NFA considerations for Unit meeting preparation. <br /> LOP Staff request RP's consultant for GT submittals of Tri-Regional Appendix A; Time to reach WQG, initial & <br /> SCLemoved mass residuals, radius of influence from remediation pilot study. RB notified on submittals in GT. <br /> clot <br /> I4OtLOP staff, PG/ PC discuss NFA and LTCP READY FOR CLOSURE consideration with CVRWQCB at Unit Meeting/ <br /> phone/email. RB concurs informally on . RB requires: to concur w/closure. <br /> L 14Staff/consultant prepare Public Participation Notice (PPN). Staff approves final PPN for consultant's use. Mailing <br /> list of effect d ro erties and adjacent properties recipients (confidential) and PPN filed in LOP file. PPN uploaded <br /> to GT on z=t ( PPN sent to city/county Budding Dept& water purveyor. <br /> Comment pen d of 60 days began Z Ir ; completed 11-11311 , #of Comments recorded in narrative <br /> to(�0(JP Staff directs RP to complete CERTIFICATION OF RECORD FEE TITLE OWNERS FOR PENDING"NO FURTHER <br /> ACTION REQUIRED"(RTO) form, per Section 25297.15 (a), if one is not in the file. Narrative to indicate Staff verified a <br /> comple1111 ted RTO is in the LOP file. The NFA closure letter may not be issued without completion of RTO. <br /> D v/uJ L P aff drafts Case Closure Summary (CCS) and CCS is reviewed by 'third party' staff member: a+ <br /> LOP Staff prepares 30-day notification letter to CVRWQCB of intention to issue an NFA and final version of CCS. <br /> �►911� LOP Staff submits 30-day CVR B letter dated'q w/CCS and file to PC for review and signature. <br /> Response due in 30 days I `� Concurrence received on:416110 Extension requested to: <br /> Non-concurrence letter from C WQCB Management received on: <br /> Staff uploads EHD letter to CVRWQCB without CCS & CVRWQCB concurrence letter w/check sheet on to GT. <br /> 2 1 1 LOdirects RP to destroy all MWs, remove all waste material & provide documentation of proper waste <br /> disposal. LOP staff reviews and approves work plan for MW destructions. Destruction permits issued <br /> (after 60 day PPN period) &Johnny notified of impending work. Destructions scheduled for <br /> 31LWLOP Staff verifies and documents in narrative the destruction of all MWs. GT"GW Monitoring Frequency" screen <br /> updated to indicate MWs are destroyed. The NFA may not be issued until MWs are destroyed. <br /> LOP Staff verifies and documents in narrative that all onsite waste material was removed and properly disposed, <br /> and EHD accounting staff verified that all SR & D site fees have been paid. The NFA may not be issued <br /> without this documentation. ,/(p/I6i' Is <br /> LOP Staff asks clerical to prepare NFA& CCS for Director's signature within 30 days of verifying destruction of <br /> all MWs and receiving documentation waste material was properly disposed. LOP Staff provides clerical the <br /> name and address of all RPs who are to receive an original NFA. <br /> PG/PC reviews NFA, CCS, and narratives for entries documenting all required steps are completed to approve <br /> issuance of NFA letter from the Director. File, NFA, & CCS returned to clerical for Director's signature. <br /> Signed CCS and NFA originals are mailed by clerical to RPs. Clerical distributes copies for LOP Staff to upload to <br /> GT, LOP File, & PC for their records. <br /> Clerical updates Envision records with PE 3528 and Manage Site Mitigation CaselROP case status/ Closed. <br /> LOP staff pulls all site files for clerical staff to place in LOP Closed File cabinets, until scanned into Questy. <br /> LOP staff updates GT"Project Information" &"Status-Definition" screens to reflect site status as Closed. <br />