Laserfiche WebLink
GROUNDWATER SAMPLING FORM <br /> PROJECT INFORMATION E <br /> OJECT NAME 'k"-- LILL PROJECT NUMBER 54 VFVT�-0110'_ WELL NO H � <br /> PROJECT MANAGER 'TYPE OF WELL. Monitoring Extraction Other <br /> RECORDED SY SAMPLED BY J4C DATE 3 <br /> WELL PURGING INFORMATION <br /> PURGE VOLUME PURGE METHOD <br /> Well basing Diameter _ <br /> ---tm_2-inch 4-inch Cther Sailer - Type r P� <br /> Pump - Type <br /> Well Total Depth CIO 6 L feet below Top of Casing,TO Other - Specify <br /> Depth to Water feet below Tap of Casing,WL Hydrecarfmn Odors <br /> Yes X No <br /> Water Column Length —?X7— feet <br /> Purge Volume Calculation (Water Column Length x Multiplier x No Volumes = Calculated Purge Volume) <br /> `L X D, I-:� X -3 = 3 C1 C1 Calculated Purge Volume = �S gallons <br /> (WCL) (Multiplier) (No Volumes) Actual Purge Volume = L2 gallons <br /> Muttlolier (Camnq Diameter r€nchesl = Gallonsllusear footle =C Y 4=Qfi6 6 1 5 _2-6 <br /> Groundwater Parameter Measurement. Meter Type ibT7 Calibrated K Yes No <br /> TIME ELAPSED FLOWRATE DTW PH EC TEE P 7URH1171TYREnax COMMENTS <br /> TIME <br /> (GPNi) (ft) anhoslcm d F (�`�� mV <br /> o D <br /> cu,$� .Kx 0-.q5 I r, P �1 pt A <br /> nog ass' 1 0 �- <br /> ,� 4 ! <br /> r <br /> ITAW <br /> I I <br /> I I I <br /> A �.+�" INC. <br /> G &VWROMME"AL.6E07ECHMICAL�����LRO <br />