My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
E
>
88 (STATE ROUTE 88)
>
14000
>
3500 - Local Oversight Program
>
PR0544811
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/20/2024 9:23:29 AM
Creation date
9/5/2019 1:04:33 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0544811
PE
3528
FACILITY_ID
FA0000091
FACILITY_NAME
Colonial Energy CE 40138 (DBA Power Mart)
STREET_NUMBER
14000
Direction
E
STREET_NAME
STATE ROUTE 88
City
LOCKEFORD
Zip
95237
CURRENT_STATUS
02
SITE_LOCATION
14000 E HWY 88
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
86
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
F <br /> l <br /> 41 <br /> Chronology 14000 Hwy 88, Lockeford <br /> Page 2 <br /> 09/08/98 Date of Corrective Action Plan using vapor extraction and air sparging <br /> (SVE/AS) for contaminant remediation that was subsequently approved by <br /> Environmental Health on 9/29/98. <br /> 814-5/99 Air sparge wells ASI-AS4 were installed. <br /> 12/13/99 The SVE/AS system was installed and startup was initiated on this date. <br /> is <br /> 02/17/00 During quarterly monitoring on this date 4.79 feet of free product was <br /> found in MWl. Hand bailing and a passive skimmer were used to remove <br /> the free product and MW1 was removed from use in the vapor extraction <br /> system. <br /> 09/01/03 The SVE/AS system operated continuously until operation was <br /> discontinued on this date due to low air contaminant concentration. <br /> 1111-2104 Secor drilled 3 soil borings(SB I2-SB14) in the release area to determine <br /> the soil contaminant concentration after remediation and to evaluate the <br /> SVE/AS operation. <br />�r <br /> 11/19/04 SVE/AS system was permanently shut down this date after being operated <br /> intermittently since September 2003. <br /> 03/17/05 Date of Results of Site Assessment, Site Conceptual Model, and Request <br /> ;5 For Site Closure report that included work done in November 2004. <br /> tlr 11/11/05 Date of addendum to the closure report prepared by Landau Associates. <br /> r <br /> h <br /> f <br />
The URL can be used to link to this page
Your browser does not support the video tag.