Laserfiche WebLink
{ <br /> 'TABL� 1 (cnfinuedJ �..a � <br /> CROUNllWATER{1VIOI�TI�OR WELLSURYAND`GAUING;D�TA <br /> e 4"'.000j:411t Highway 88 :: r e <br /> . ° <br /> Well Gauging Top of Casing Depth to Groundwater <br /> I.D. Date Elevation Groundwater Elevation <br /> (Feet) (Feet) (Feet) <br /> MW-5 07/19/96 99.46 77.09 22.37 <br /> I <br /> MW-6 07/19/96 99.34 69.93 29.41 <br /> MW-707/19/96 98.98 68.64 30.34 <br /> MW-8 07/19/96 100.77 73.65 27.12 <br /> MW-9 07/19/96 99.63 77.51 22.12 <br /> MW-10 08/01/96 100.51 67.70 32.81 <br /> Initial survey conducted on 1/19/95 for monitor wells MW I through MW-4 with an arbitrary datum of 100 feet assumed <br /> at the southeast comer of underground storage tank concrete pad. Monitor wells MW-5 through MW-10 were surveyed <br /> on 8/02196 at chiseled square,the same southeast corner of tank pad. <br /> 1 <br /> s ' <br /> F <br />