Laserfiche WebLink
r <br /> Work Plan to Perform Subsurfa•Investigation • BASI 01-09-002-CA <br /> Sutter Orchard <br /> December 10, 2009 <br /> Page 3 of 3 <br /> Documentation and Report Preparation <br /> After completion of field activities and receipt of all analytical results, ADR will compile and <br /> evaluate site data and prepare a results report, which will be submitted to EHD for review. <br /> The report will contain the results of the fieldwork, including a description of materials <br /> encountered during advancement of the soil borings, and an assessment of sampled soil <br /> quality. <br /> Tentative Schedule <br /> ADR will schedule the work to be performed within three working days of EHD Permit/Work <br /> Plan approval. The date of field work will depend on driller availability. Assuming all drilling <br /> locations are accessible, fieldwork is anticipated to take 1 day to complete. Soil sample <br /> analytical results will be available within 6 business days of fieldwork. ADR's report of <br /> results will be submitted to EHD for review within approximately 5 business days of the <br /> receipt of laboratory results. <br /> If you have any questions, please contact the undersigned at (916) 921-0600. <br /> Sincerely, <br /> ADRENVIRONMENTA GROUP, INC. kss`ONALcFo`o <br /> 4 <br /> a¢ LARRY �Na <br /> FLORA <br /> Or <br /> a No,4759 <br /> A `P <br /> Larry A. Flora, California P.G. #4759 �rFOPCAOFoPe <br /> Geologist <br /> Attachments <br /> cc: Jeffery Reed, Basic Resources, Inc. <br />