My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
E
>
88 (STATE ROUTE 88)
>
17345
>
2900 - Site Mitigation Program
>
PR0531135
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/20/2024 9:24:23 AM
Creation date
9/5/2019 2:02:09 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0531135
PE
2950
FACILITY_ID
FA0020055
FACILITY_NAME
SUTTER ORCHARDS
STREET_NUMBER
17345
Direction
E
STREET_NAME
STATE ROUTE 88
City
CLEMENTS
Zip
95237
APN
01922001
CURRENT_STATUS
01
SITE_LOCATION
17345 E HWY 88
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r <br /> Work Plan to Perform Subsurfa•Investigation • BASI 01-09-002-CA <br /> Sutter Orchard <br /> December 10, 2009 <br /> Page 3 of 3 <br /> Documentation and Report Preparation <br /> After completion of field activities and receipt of all analytical results, ADR will compile and <br /> evaluate site data and prepare a results report, which will be submitted to EHD for review. <br /> The report will contain the results of the fieldwork, including a description of materials <br /> encountered during advancement of the soil borings, and an assessment of sampled soil <br /> quality. <br /> Tentative Schedule <br /> ADR will schedule the work to be performed within three working days of EHD Permit/Work <br /> Plan approval. The date of field work will depend on driller availability. Assuming all drilling <br /> locations are accessible, fieldwork is anticipated to take 1 day to complete. Soil sample <br /> analytical results will be available within 6 business days of fieldwork. ADR's report of <br /> results will be submitted to EHD for review within approximately 5 business days of the <br /> receipt of laboratory results. <br /> If you have any questions, please contact the undersigned at (916) 921-0600. <br /> Sincerely, <br /> ADRENVIRONMENTA GROUP, INC. kss`ONALcFo`o <br /> 4 <br /> a¢ LARRY �Na <br /> FLORA <br /> Or <br /> a No,4759 <br /> A `P <br /> Larry A. Flora, California P.G. #4759 �rFOPCAOFoPe <br /> Geologist <br /> Attachments <br /> cc: Jeffery Reed, Basic Resources, Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.