My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0012726
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
E
>
88 (STATE ROUTE 88)
>
13975
>
2900 - Site Mitigation Program
>
PR0522057
>
ARCHIVED REPORTS_XR0012726
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/20/2024 9:21:19 AM
Creation date
9/5/2019 2:44:00 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0012726
RECORD_ID
PR0522057
PE
2950
FACILITY_ID
FA0015024
FACILITY_NAME
USA GASOLINE #3756
STREET_NUMBER
13975
Direction
E
STREET_NAME
STATE ROUTE 88
City
LOCKEFORD
Zip
95237
APN
01908014
CURRENT_STATUS
01
SITE_LOCATION
13975 E HWY 88
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
210
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br /> M1 21 <br /> z<� <br /> AGS .lob No. 87048-1 <br /> July 16, 1987 <br /> Beacon Station 4675 - Lockeford, CA <br /> i <br /> i <br /> Soya samples were collected from the boreholes with a California <br /> modified split spoon sampler. Descriptions of earth materials <br /> / encountered in borings B-1 through B-4 are presented on the <br /> Goring Lags, <br /> Plates P-4 through P-15. Plate P-3 gives a summary <br /> of the Unified soil Classification System used to identify the E <br /> Soils. The earth materials encountered at this site consist <br /> primarily of sand and gravelly sand. <br /> ti. <br /> C <br /> Soil samples collected from approximately 25 through 41 feet in <br /> f <br /> r <br /> depth from boring B-2 were subjectively analyzed as having <br /> . Cuttings from the boreholes were <br /> hydrocarbon contamination <br /> ain the responsibility of the site <br /> piled at the site and rem <br /> owner. <br /> i <br /> ,I: <br /> SOIL SAMPLING PROCEDURE I <br /> J <br /> Fifty-five soil samples were collected and described from borings <br /> B-1 through B-4 during drilling. These samples, labeled as j <br /> indicated on the Boring Logs, were collected at 5-foot intervals. <br /> -from the ground surface to total depth. Soil samples were <br /> collected by advancing the boring to a point immediately above <br /> :i . <br /> the sampling depth and then driving a California modified y <br /> 4 <br /> i; <br /> APP11e "wSYStems <br />
The URL can be used to link to this page
Your browser does not support the video tag.