My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0002312 SSNL
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MACARTHUR
>
18087
>
2600 - Land Use Program
>
UP-93-07
>
SU0002312 SSNL
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2020 11:29:11 AM
Creation date
9/6/2019 9:54:24 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
FileName_PostFix
SSNL
RECORD_ID
SU0002312
PE
2626
FACILITY_NAME
UP-93-07
STREET_NUMBER
18087
Direction
S
STREET_NAME
MACARTHUR
STREET_TYPE
DR
City
TRACY
Zip
95376
APN
21302001
ENTERED_DATE
10/26/2001 12:00:00 AM
SITE_LOCATION
18087 S MACARTHUR DR
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\M\MACARTHUR\18087\UP-93-07\SU0002312\SS STDY.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
.. ..a <br /> OLD RIVER GOLF COURSE <br /> Page No. 9 <br /> APPENDIX A <br /> ENGINEERED FILL SPECIFICATIONS <br /> ( 1) Preliminary Operations <br /> After the cleaning and stripping operation and the cuts have <br /> been completed and before any fill is placed in any particular <br /> area, the existing surface shall be scarified to a depth of 6 <br /> inches and compacted to dry densities in excess of 90 percent <br /> of the maximum dry density as obtained by the Modified <br /> Compaction Test, ASTM D1557, designation. It may be necessary <br /> to adjust the moisture content of the subgrade soil by <br /> watering or aeration, to bring the moisture content of the <br /> soil near optimum in order that the specified densities can be <br /> obtained. <br /> (2) Source of Material <br /> Engineered fill materials (on site or import) shall consist of <br /> sandy silts, sands, or sands and gravels unless stated <br /> otherwise in the report. Engineered fill material shall not <br /> contain rocks greater than 3 inches in greatest dimension and <br /> should be nonexpansive in nature with a plasticity index less <br /> than 12. <br /> At least seven days prior to the placement of any fill, the <br /> engineer shall be notified of the source of materials and <br /> samples shall be obtained to determine the suitability of the <br /> materials and for conducting laboratory compaction test on <br /> these samples. <br /> (3 ) Placing and Compacting <br /> Fill materials shall be spread in layers and shall have a <br /> uniform moisture content that will provide the specified dry <br /> density after compaction. If necessary to obtain uniform <br /> distribution of moisture, water shall be added to each layer <br /> by sprinkling and the soil disced, harrowed, or otherwise <br /> manipulated after the water is added. The layers of the fill <br /> material shall not exceed 8 inches and each layer shall be <br /> compacted with suitable compaction equipment to provide the <br /> specified dry densities. <br /> ' t VERS h <br /> D �^ <br /> �SSOG\ <br /> r <br />
The URL can be used to link to this page
Your browser does not support the video tag.