Laserfiche WebLink
Kerry Sullivan -2- <br /> COMMENTS ON DEVELOPMENTS <br /> PA-0200001 <br /> 3. The Traffic Impact Mitigation Fee will be required for this development. The fee is due and payable at the <br /> time of building permit application. (The fee currently is $184.54per daily trip-end generated in the Tracy <br /> area. The fee shall be automatically adjusted July 1 of each year by the Engineering Construction Cost <br /> Index as published by the Engineering News Record. A credit may be allowed if it can be verified that the <br /> existing development on this site was in operation on or after April 23, 1990.) <br /> (Resolutions R-00-433) <br /> 4. A copy of the Final Site Plan shall be submitted prior to release of building permit. <br /> 5. Verification shall be obtained from the Solid Waste Division (468-3066) that this development has met the <br /> requirements of the Waste Plan Format for Development Projects. Final Site Plan is required upon <br /> submittal of verification. <br /> 6. <br /> and cement delive Lcility shall b e ased-fibrthe tr"'11C index. The <br /> it ed to do <br /> 7. 6. A Maintenance Agreement to ensure that Mac Arthur Drive and any other County roads utilized as a haul <br /> route is maintained to a condition acceptable to San Joaquin County shall be executed by the applicant. <br /> The Maintenance Agreement shall remain in force for the duration of operation under this permit. The <br /> applicant shall pay a $465.00 fee for preparing the Maintenance Agreement. In lieu of a Maintenance <br /> Agreement a one time payment to the road maintenance fund may be allowed This payment shall be <br /> considered as a fair share equivalence for the maintenance of MacArthur Drive and other roads used as the <br /> haul route. <br /> GK:BN:sh <br /> P.1C O M M E N T%URPA-0200001(wisionQmpd <br />