Laserfiche WebLink
determined, the slope configuration may then have to be modified to include <br /> locally flatter slopes. <br /> Conveyor Transport <br /> As stated in our letter of October 31, 1990, mined sand and gravel will be <br /> transported to Teichert's adjacent processing facilities via an open-cut <br /> underground conveyor. (Please refer to this letter in the appendix.) Necessary <br /> entitlements to construct the underground conveyor crossing will be obtained <br /> prior to installation. <br /> PG&E Letter of November 27, 1990 <br /> Per PG&E's comment, Teichert Aggregates has noted the position of the anchor <br /> guy and will observe the requested setback of 25 feet or will make other <br /> arrangements satisfactory to PG&E. We also acknowledge the new 8-inch gas <br /> line to be installed on the western side of MacArthur Road. <br /> APCD Letter of November 19, 199() <br /> Teichert will comply with all San Joaquin County Air Pollution Control District <br /> rules and regulations as outlined in their letter. Dan Barber, Teichert's <br /> environmental engineer, and Ron Turcotte, Tracy Plant Manager, are the <br /> individuals designated to respond to inquiries from Lakhmir Grewal's staff. `their <br /> telephone numbers are (916) 386-6982 and (209) 946-8590. <br /> Text Modifications and/or Clarifications <br /> Hours of Operation <br /> Proposed hours of operation are 5:00 A.M. to 9:00 P.M., Monday though <br /> Saturday. (It is understood that Teichert may request extended hours in case of <br /> emergency or for special jobs.) <br /> Lighting <br /> Any night lighting that might be employed will be arranged and controlled so as <br /> not to illuminate public rights-of-way or adjacent properties or to impact the <br /> 4 <br />