Laserfiche WebLink
Landscaoing <br /> Five-gallon acacia longifolia bushes will be planted at 5-foot intervals along <br /> MacArthur Road. Planting is to be completed by December 1991. Three growing <br /> seasons are to occur prior to the commencement of mining. Water trucks will <br /> water these plants during summer and drought periods. <br /> Setbacks <br /> All final elevations within 25 feet of any property boundary will be equal to those <br /> of the abutting property. <br /> Per our agreement with Tom Gau, a 10-foot dedication, or other as determined by <br /> Public Works for future expansion of MacArthur road, will be granted to the <br /> County. <br /> Triple E Produce <br /> Triple E has expressed concerns regarding dust impacts on its outside <br /> compressors. Teichert proposes the following mitigation measures: <br /> 1. Fifteen-gallon acacia plants will be planted at 5-foot intervals along the <br /> ±740-foot common boundary. <br /> 2. Planting is to be completed by December 1991 or sooner. <br /> 3. A minimum of three growing seasons are to occur prior to commencing <br /> mining. <br /> 4. Water trucks will water these plants during summer and drought periods. <br /> 5. At all times, water trucks will be available to control dust. As excavation <br /> proceeds to greater depths, dust will, in any case, become less of an issue <br /> due to both the depth of excavation and the moisture contents of the <br /> material excavated. <br /> 6 <br />