Laserfiche WebLink
i <br /> 8 . Attach a brief descripticn the extent of the mined lands to be <br /> involved in this operation . Include legal description and total <br /> acres . <br /> Section (s ) W 1/4 Sec. 10Township 3 South Range 5 East <br /> i <br /> 9 . Describe the access route to the operation site <br /> The site can be reached from Interstate 5 by taking Business Loop 205 west to <br /> MacArthur Road, then approximately 2- 1/4 miles south. <br /> DESCRIPTION <br /> 10 . Mineral commodity to be mined_ Sand and gravel <br /> 9 <br /> 11 . Geologic Description - Briefl * describe general <br /> 9 P } geologic setting , <br /> with more detailed geologic description of mineral deposit to be <br /> L <br /> mined, ana principal soil or rock types present . <br /> L The Rose property is in the Corral Hollow alluvial fan and the dominant rock <br /> types are sandstone, quartz and chert . The soil is sorrento clay. (See attached <br /> project description for more detail . ) <br /> i 12 . Environmental Description - Briefly describe environment of site <br /> and surrounding area . Include existing area land use , soil , vege- <br /> tation, ground water elevation, surface water characteristics, <br /> 4 average annual rainfall and other factors pertaining to environ- <br /> mental impacts and their mitigation and reclamation . (Use addi- <br /> tional paces if necessary ) <br /> i. The site is currently planted with walnuts. Apricot orchards exist to the south <br /> ` <br /> and east . A packing shed is located to the north and mining occurs to the west . <br /> Groundwater is located at ± 110 - 140' . <br /> r <br /> PROPOSED/EXISTING SURFACE MINING OPERATION <br /> t. <br /> 13 . Proposed starting date of operation Dependent on area market, harvesting <br /> Estimated life of operation * 3 years Pereira and EP-84- 10 phases . <br /> ` Duration of first phase '- 3 years <br /> 14 . Ooeration will be <br /> Lcontinuous x seasonal intermittent <br /> developed, not yet in operation <br /> temporarily deactivated stockpile in mine <br /> `. <br /> v. <br /> Reclamation Plan <br /> Quarry Excavation - 2 - ( 3/89 ) <br />