Laserfiche WebLink
a4AS!1y SAN JOAQUIN COUNTY <br /> r• ; : COMMUNITY DEVELOPMENT DEPARTMENT <br /> • 1810 E.HAZELTON AVE..STOCXTON,CA 85205-8232 <br /> • � jo'�^N`r PHONE:20B/48&3121 FAX:209/48&3183 <br /> April 19, 2001 <br /> M_E_M_O_R_A_N_D_U_M <br /> TO. Development Committee <br /> FROM: Leanne Mueller, Associate Planner <br /> SUBJECT: REVISION OF APPROVED ACTIONS FOR QX-84-10 OF TEICHERT <br /> LAND COMPANY <br /> The applicant has submitted the above referenced Revision of Approved Actions <br /> application for an approved Quarry Excavation permit. The request is to change <br /> Condition of Approval 15 to extend the time frame for the reclamation of the Traina West <br /> site by approximately 10 years. Reclamation will begin at the Flintkote site. Rinse water <br /> going to the Flintkote site will be diverted to the Traina West site and used until mining <br /> has been completed. <br /> The project site is located on the east side of Tracy Boulevard, 1200 feet south of Linne <br /> Road, Tracy. <br /> The application is scheduled to be heard by the Planning Commission on May 16, 2002. <br /> The Community Development Department has reviewed the proposed Revision of <br /> Approved Actions and will be recommending that it be approved. The revised condition <br /> will read as follows: <br /> The rehabilitation of each phase shall be completed, in conformance with the <br /> rehabilitation plan, within two (2) years of the completion of the extraction portion of <br /> that phase. Rehabilitation shall be completed as soon as feasible. The schedule for <br /> rehabilitation will be a part of the approval of the excavation. It will define each phase <br /> of the excavation. The phases may be based on the sequence in which individual <br /> areas are to be excavated and rehabilitated, or on the sequence in which various <br /> operations are to be carried out in each area during each phase. The cost of <br /> rehabilitation shall be determined for each phase in order to determine the amount of <br /> performance guarantee. <br /> Rehabilitation of parcels 253-120-14,27, known as the Traina West parcel may be <br /> deferred while the Traina West parcel is used for the storage and filtering of water <br /> from the Tracy Rock Plant(parcels 253-120-46 12 &47). Rehabilitation of the Traina <br /> West parcel shall be completed within two years of the time the Traina West parcel is <br /> no longer used for the storage and filtration of water from the Plant and prior to 12 <br /> years from the approval of the Revision of Approved Actions. <br />