Laserfiche WebLink
Item No. .5 <br /> - PC : ,..5-17-84 <br /> EP-84-10 <br /> Page 4 <br /> CONDITIONS <br /> EXCAVATION PERMIT NO . EP-84-10 <br /> A . TEICHERT & SON, INC. <br /> 1 . United States Bureau of Reclamation : <br /> a . Material sloughing from the excavation-cut slopes adja- <br /> cent to Bureau facilities will not be disturbed or <br /> removed. <br /> b .. The cut slopes of the excavation adjacent to Bureau faci- <br /> lities will not be steeper than a grade of two feet -hori- <br /> zontal to one foot vertical . <br /> c . All sloughing of and/or seepage through the Phase I cut <br /> slopes adjacent to the canal will be reported to our <br /> Tracy Field Office immediately . <br /> d. Upon request, Bureau engineers will be admitted to the <br /> excavation site to inspect the cut slopes adjacent to the <br /> canal . <br /> e . If , in the opinion of the Bureau, conditions develop that <br /> could affect canal stability, Teichert and Son will be <br /> required to suspend further excavation near the area of <br /> concern until the completion of any necessary analysis <br /> and remedial work. <br /> f . Excavation shall not penetrate the groundwater surface . <br /> g . Excavation shall not extend further than 100 feet from <br /> the Bureau property line . <br /> 2 . Pacific Gas and Electric Comoanv: <br /> a . The applicant shall submit the excavation plan for review <br /> and approval by PG&E prior to excavation in areas of <br /> existing overhead or underground facilities . <br /> 3 . No stockpiled soil or material shall be placed closer than <br /> twenty-five ( 25 ) feet to a property boundary . <br /> 4 . All private roads involved in an excavation shall be main- <br /> tained so as to control the creation of dust . The first one- <br /> hundred ( 100 ) feet of any private road on the property which <br /> intersects with a publicly maintained road shall be surfaced <br /> in a manner approved by the agency responsible for the main- <br />