WASTE DISCHARGE REQUIREMENTS ORDER NO. R5-2002-0220 -2- <br /> TEICHERT AGGREGATES <br /> TRACY ROCK PLANT <br /> SAN JOAQUINCOUNTY <br /> 8. The Discharger estimates that approximately 12.1 millions tons of usable aggregate remain <br /> on the Pereira Property, and that excavation and processing of the remaining aggregate will <br /> take place over 7 to 10 years. <br /> 9. The Discharger also accepts cured waste concrete and asphaltic concrete for crushing and <br /> recycling as road base. No wastewater is generated as a result of this activity. <br /> 10. Overburden removed from mining areas is placed as fill to facilitate reclamation, usually in <br /> former excavation areas. No waste piles are maintained at the facility. <br /> 11. Wastewater originates from washing aggregate materials and processing equipment. The <br /> wash water is recycled as much as possible, however, due to infiltration and evaporation, <br /> up to 1,800 gallons per minute (2.6 mgd) of makeup water is added during processing. All <br /> industrial wastewater generated on-site is discharged to a series of settling ponds. No <br /> flocculants or other chemicals are added to the wastewater. <br /> 12. Based on analytical data provided in the RWD, the chemical character of the wastewater is <br /> summarized below. <br /> Analytical Result <br /> Settling Pond <br /> Constituent/Parameter Units Plant Effluent Supernatant <br /> Total Dissolved Solids mg/L 581 595 <br /> pH 7.5 7.5 <br /> Total Alkalinity mg/L 123.9 136.5 <br /> Total Hardness mg/L 259.1 261.1 <br /> Sodium mg/L 103 106 <br /> Potassium mg/L 3.1 5.1 <br /> Chloride mg/L 28 28 <br /> Sulfate mg/L 27 26 <br /> 13. Currently, wastewater is discharged to one of several settling ponds owned by Calaveras <br /> Materials, Inc. (the Flintkote settling ponds) or on-site settling ponds east of the current <br /> excavation area, as shown on Attachment A. The Flintkote settling ponds are on <br /> Assessor's Parcel Number 253-12-17 in Section 9, T3S, R5E,MDB&M. <br /> 14. All existing settling ponds are within former aggregate excavation areas and are typically <br /> used until they fill up with fines. Filled ponds are reclaimed in accordance with the <br /> Discharger's Surface Mining and Reclamation Act (SMARA) Reclamation Plan. <br />