Laserfiche WebLink
WASTE DISCHARGE REQUIREMENTS ORDER NO.R5-2002-0220 -4- <br /> TEICHERT AGGREGATES <br /> TRACY ROCK PLANT <br /> SAN JOAQUIN COUNTY <br /> settling pond area is 150 acres. Precipitation that falls on current and former mining areas <br /> that do not drain to the settling ponds flows into agricultural tailwater ponds created to <br /> reclaim the land for agricultural use. The Discharger will construct site improvements as <br /> needed to redirect storm water flows to the new settling ponds so that there is no discharge <br /> of stone water to surface water drainage courses. <br /> 24. The Discharger's water balance indicates that the water surface elevation within the three <br /> new ponds will rise by approximately 15 feet during normal rainfall years, and by <br /> approximately 20 feet during the 100-year total annual precipitation event. Any water that <br /> overtops the three settling ponds will be contained within the bermed pond area, which <br /> provides an additional 28 vertical feet of storage over 22.3 acres. <br /> 25. The Discharger has not submitted any detailed as-built drawings or earthwork <br /> specifications for the perimeter berm to demonstrate that it is adequate to contain water. <br /> Therefore, it is appropriate to require the Discharger to submit such documentation. <br /> 26. In the past, others have operated concrete batch plants at the site. The Discharger once <br /> operated an asphalt batch plant,but it was recently relocated to the Discharger's Vernalis <br /> processing facility. The Discharger may wish to operate a portable asphalt plant and/or <br /> concrete batch plant at the facility in the future. There are underground asphalt storage <br /> tanks at the facility, which are not currently in use. Therefore, it is appropriate to include <br /> discharge specifications and provisions that address this potential future use. <br /> Site-Specific Conditions <br /> 27. The average annual precipitation is approximately 10 inches and reference <br /> evapotranspiration (ETo)rates average approximately 57 inches per year. <br /> 28. Surrounding land uses are primarily industrial and agricultural. Tracy Municipal Airport is <br /> located west of the site. <br /> 29. Process water is supplied by an onsite groundwater well equipped with a 4,000-gpm pump. <br /> A second supply well near the scale house supplies non-potable water to the scalehouse. <br /> Drinking water for the site is supplied by bottled water. The Discharger does not treat the <br /> groundwater prior to use. <br /> 30. According to the RWD, the entire facility site has been disturbed by previous and current <br /> mining activities, and there are no defined surface water drainage courses on-site. <br /> However, local drainage is to the Sacramento-San Joaquin River Delta. <br /> 31. The facility is outside the 100-year flood zone. <br /> Groundwater Considerations <br /> 32. Groundwater exists approximately 90 feet below ground surface. Based on interpretation <br /> of the surface topography, groundwater likely flows to the northeast. No site-specific <br /> groundwater quality data are available. <br />