Laserfiche WebLink
Item Na. 2 <br /> PC: 12-16-93 ... <br /> ER-93-INP-93-4 <br /> Page 23 _ <br /> 1 . <br /> i <br /> MilioationMgar�e: Piacemerit of plastic sheeting debris fences, silt fences` andlor hay bales <br /> W . .±gibed surtarces during storms doting'.(*nMC ion. Following construction, all <br /> dmitirbed Kwfaces, espx**slopes, MW be revegetated, <br /> bkoksfw Rte: On-site inspection. <br /> Aoenc►►Re ports!.1 : Sort Joaquin County Community Development DepartmwvL <br /> MMft Or EMMM StMQD&WM: As necessary during Win, prior to issuarx:e <br /> d Cie of Oxy. <br /> WATER R S CES <br /> Mltiaatian Ai r re: Construction of on-site drainage system, as proposed. The <br /> Fc pond filet will collect surface runoff from the active working area of the yard <br /> and wood waste area shaaii be fined. <br /> Monkodrm Rec Wement: Show on Improvement Plan. <br /> A : San Joaquin County Cvmnwnity Development Department r� <br /> jkObg or Freguericv.of MgOLo ing: Improvement Plan. <br /> Miticration Measure: All surface areas involved In the transporting,processing,or storage of waste <br /> shall be Wired or bred and drains¢to a catchment facility. <br /> M.orLOrirM BMIrement: Show on Improvement Plan. <br /> Person/Aaency Resegagbte: San Joaquin County Community Development Department. <br /> TkTft or ftnam of M riRod : Improvement plan, <br /> Mid ation M re: The proposed receiving and.processing operations shall take place within <br /> covered and paved facilities. The outdoor wood and yard waste composting area shall be tiaed <br /> gamed The transfer station building shall be constructed such that storm runoff does not come <br /> into contact with waste or revered materift liquids leached from the received waste and <br /> wash down water shall be directed into holding tanks or lined evaporation ponds. <br /> Monitoring Requirement: Shaw on building plans and on Improvement Plan. <br /> PersonftenQe Responsibis: San Joaquin County. Building inspection, San Joaquin <br /> County Community Development Department. <br /> Timing or Freguency of Monitoring: Improvement Plan, prior to issuance of Building <br /> Permit.. <br /> l _ <br />