Laserfiche WebLink
4 • <br /> Item No. 2 <br /> 4 PC. 12-1&93 .�. <br /> s ER-93-1/UP-93.4 <br /> { Page 2S <br /> widening and deepening of the channel adiecent to theme'e} <br /> ulreme • Show on Improvement.Pian. ` <br /> Person/Agenev Res e: Sart Joaquin County QMMUFAY"Wamram errt <br /> of.Pubic Works, Flood Control Division. <br /> Mmky or FLeguency of Monis � . lmpraMTH"Plan., <br /> VISUA A ETICS <br /> M20[2rinp Measure: Litter Shall be picked up r9gularly from the <br /> project: site, surrounding <br /> properties and along tite approach to the site. <br /> Monitoring ReWrement: Daily litter patrols shall collect project related litter. <br /> PemonLAgancy Rewonsible: Applicant. <br /> Tinimg or Frequency of Monitoring: Througitp A the rife of the project. <br /> AIR OUALTiY _ ! <br /> Monitoring Measure•- Preparation of a PMlo Dust Prevention and Control Plan that includes the - <br /> dust control measures specified in Chapter 4.7, Condition 4.7-1. <br /> Molo-ring Requirement: Submit copy of plan. . <br /> Perso.__ n/Aaancy Resroonsible: San Joaquin Valley Unified Air Pollution Control District. <br /> Timing or EMMncy of Monitoring: Prior to Issuance of building or grading permits. <br /> Monitori Measure: Daily wash d cleaning of the tipping floor and periodic steam cleaning <br /> of the transfer trailers. <br /> Monitoring Requirement: Daily, and as needed to control odor. <br /> PersogLAAeng0esponsIbLe. Applicant <br /> 'riming or Frequency of Monitoring: Throughout the life of the project, <br /> i <br />