Laserfiche WebLink
CONDITIONS OF APPROVAL <br /> PA-0800005 <br /> TRACY MATERIALS RECOVERY, INC. <br /> Use Permit Application No. PA-0800005 was approved by the San Joaquin County Planning <br /> Commission on February 2,2012. The effective date of approval is February 12, 2012. This approval <br /> will expire on August 13, 2013, which is 18 months from the effective date of approval, unless (1) all <br /> Conditions of Approval have been complied with, (2) all necessary building permits have been <br /> secured and remain in force, and (3) all necessary permits from other agencies have been secured <br /> and remain in force. <br /> Unless otherwise specified, all Conditions of Approval and Ordinance requirements shall be fulfilled <br /> prior to the establishment of the use and the issuance of any building permits. Those Conditions <br /> followed by a Section Number have been identified as Ordinance requirements pertinent to this <br /> application. Ordinance requirements cannot be modified, and other Ordinance requirements may <br /> apply. <br /> 1) COMMUNITY DEVELOPMENT DEPARTMENT(Staff Contact: John Funderburg,468-3160) <br /> a) BUILDING PERMIT: Submit an "APPLICATION-COMMERCIAL BUILDING PERMIT'. The Site <br /> Plan required as a part of the building permit must be prepared by a registered civil engineer or <br /> licensed architect. This Plan must show drainage, driveway access details including gates, on-site <br /> parking, landscaping, signs,existing and proposed utility services,and grading (refer to the"SITE <br /> PLAN CHECK LIST'for details). A fee is required for the Site Plan review. (Development Title <br /> Section 9-884) <br /> b) APPROVED USE: This approval is for the expansion of an existing solid waste processing and <br /> recycling facility from 39.2 acres to 51.7 acres in two phases over twenty years with a maximum of <br /> 1,727 vehicles per day at final build out as shown on the Revised Site Plan dated June 22, 2011. <br /> (Use Type: Major Impact Services) Phase 1 to increase the daily waste capacity from 1,000 <br /> tons per day (TPD) to 1,800 TPD within ten years from the date of approval. Building permits <br /> for Phase 1 site improvements to be issued within eighteen months from the date of approval. <br /> i) Phase 1 site improvements will include: <br /> (1) Addition of 19,200 square feet to the existing 57,200 square foot material recovery facility <br /> and transfer station building, <br /> (2) Addition of 10,500 square feet to the existing maintenance and administration building, <br /> (3) Construction of a one mega-watt wood waste bio-mass gasification unit. <br /> (4) Construction of a 5,000 square foot covered storage area and loading dock <br /> ii) Phase 2 to increase the daily waste capacity from 1,800 TPD to 2,500 TPD within twenty <br /> years from the date of approval. An Improvement Plan for Phase 2 shall submitted 180 days <br /> prior to the increase in daily waste capacity. The Improvement Plan shall include a revised <br /> Solid Waste Facility Permit. <br /> iii) The project will employ 160 persons and operate 24 hours a day, 7 days a week. All outdoor <br /> processing activities will not begin before 6:00 am and will not operate after 10:00 pm. On <br /> site activities to include vehicle maintenance, equipment storage and truck parking, <br /> processing of construction and demolition of inert debris, chipping/grinding of wood waste, <br /> Conditions of Approval - 1 - PA-0800005 <br />