My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0006921
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MACARTHUR
>
30703
>
2600 - Land Use Program
>
PA-0800005
>
SU0006921
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2020 11:32:48 AM
Creation date
9/6/2019 9:55:55 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0006921
PE
2627
FACILITY_NAME
PA-0800005
STREET_NUMBER
30703
Direction
S
STREET_NAME
MACARTHUR
STREET_TYPE
DR
City
TRACY
APN
25313019 26
ENTERED_DATE
1/24/2008 12:00:00 AM
SITE_LOCATION
30703 S MACARTHUR DR
RECEIVED_DATE
1/11/2008 12:00:00 AM
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\M\MACARTHUR\30703\PA-0800005\SU0006921\APPL.PDF \MIGRATIONS\M\MACARTHUR\30703\PA-0800005\SU0006921\CDD OK.PDF \MIGRATIONS\M\MACARTHUR\30703\PA-0800005\SU0006921\EH COND.PDF \MIGRATIONS\M\MACARTHUR\30703\PA-0800005\SU0006921\EH PERM.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
730
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Item No. 2 <br /> PC: 12-16-93 <br /> ER-93-1/UP-93-4 <br /> Page 9 <br /> L landscaping shall be .installed in accordance with the approved Site Plan and <br /> Improvement Pian. Landscaping details shall be consistent with Chapter 9-1020 of the <br /> Development Title, be included on the Improvement Pian, and be installed prior to <br /> issuance of the Certificate of Occupancy for the office/mafntenance building. <br /> g. Utter(shall be picked upon a daily basis on the pro]ecx site an&adang the site's frontage <br /> on MacArthur Drive. Litter shall be picked up on surrounding properties as needed, <br /> h. Except for the wood and yard waste composting operations, al waste handling and <br /> transfer operations shall take place within the approved transfer building. <br /> I. All doors,windows,and unscreened openings at the transfer building shall remain closed <br /> unless in actual use. <br /> } All new cuts and .fills shall be consistent with the geotechnical recommendations <br /> contained in Appendix F of the Final EIR. In areas where slopes are steeper than 2:1,the <br /> following mitigation measure shall be implemented: regrade slopes to 21 or flatter,or set <br /> back all improvements at W=.30 feet from the top and bottom of slopes, or erect <br /> landslide debris barriers. <br /> k. Cionstructiors of fills,foundations,slabs.and roadways on the site shall be in accordance <br /> with the geotechnical recommendations contained In Appendix F of the Final EIR. <br /> I. Placement of plastic sheeting,debrisifences,silt fences.and/or hay bales shall be utilized <br /> to protect disturbed surfaces during storms during construction activities. Following <br /> construction, all disturbed surfaces, especially slopes, shall be revegetated. <br /> M. The area where the windrows will be located for the outdoor wood and yard waste <br /> composting shall be paved. <br /> n. Personnel working with the load screening program'and on the'lipping floor•shall have <br /> 40 hours of OSHA training on spill containment. personal protective equipment. and the <br /> handling of recyclable household hazardous materials. <br /> o. Any mitigation monitoring done by the Community Development Department shall be <br /> done on a time and materials basis paid for by the applicant. <br /> 2 AIR POLLUTION CONTROL DISTRICT: <br /> a A PM10 Dust Prevention and Control Plan shall be prepared that includes the dust control <br /> measures specified in Chapter 4.7, Mitigation 4.7-1, of the Final EIR. <br /> b. A Standard Operating Procedure (SOP)shall be developed to address the elimination of <br /> the generation and emission of odors as much as possible. The SOP shall include <br /> measures to allow for the shortest possible holding time of waste brought to the facility. <br /> as well as contingency measures in the event of excess odor generation and/or nuisance <br /> complaint. <br />
The URL can be used to link to this page
Your browser does not support the video tag.