Laserfiche WebLink
L <br /> copy- <br /> Other sources used: <br /> 7. Hazards: <br /> a. Will the project create a risk of <br /> explosion; release, generate or <br /> store any hazardous substances; or <br /> cause other dangers to public health <br /> and safety? <br /> b. Are there any known hazardous <br /> substances located within Soo feet of <br /> the boundaries of this project, if in <br /> an existing or proposed residential <br /> area (this could include possible <br /> groundwater contamination)? �( <br /> C. Will the project result in <br /> interference with, or need for, <br /> .emergency plans? <br /> Other sources used: <br /> S . Utilities and Public Service: <br /> ** a. Will the project require alteration of, <br /> addition to, or the need for new utility <br /> systems (water, sewer, drainage, solid <br /> waste) , including a Sphere of Influence <br /> or district boundary change? <br /> ** b. Will the project result in the <br /> need for or the expansion of the <br /> following services: fire and police <br /> Protection, schools, parks and <br /> recreation, libraries, roads, flood <br /> control, solid waste or other public <br /> works facilities, public transit, or <br /> gover;vnental' services? <br /> C. Will the project adversely impact <br /> existing recreational/park <br /> opnortunities or require new <br /> pzrk/recreation onportunit=es? <br /> rrata: ** <br /> 'Yes" answers to these two auestiaaa and 9 (b) below <br /> will rer1ui=g additional discussion, but do not necessarily <br /> ,ndicate a ^atentially significant impact. <br /> =nitaal Studv (Reir:01/9i) <br /> 5 <br />