Laserfiche WebLink
Conditions <br /> Use Permit Application No. PA-0800005 was approved by the Planning Commission on . The <br /> effective date of approval is . This approval will expire on , which is 18 months from the <br /> effective date of approval, unless (1) all Conditions of Approval have been complied with, (2) <br /> all necessary building permits have been issued and remain in force, and (3) all necessary <br /> permits from other agencies have been issued and remain in force. <br /> Unless otherwise specified, all Conditions of Approval and ordinance requirements shall be <br /> fulfilled prior to the establishment of the use and the issuance of any building permits. Those <br /> Conditions followed by a Section Number have been identified as ordinance requirements <br /> pertinent to this application. Ordinance requirements cannot be modified, and other <br /> ordinance requirements may apply. <br /> 1) COMMUNITY DEVELOPMENT DEPARTMENT(Staff Contact:John Funderburg, 468-3160) <br /> a) BUILDING PERMIT: Submit an"APPLICATION-COMMERCIAL BUILDING PERMIT". The Site Plan <br /> required as a part of the building permit must be prepared by a registered civil engineer or licensed <br /> architect. This Plan must show drainage,driveway access details including gates, on-site parking, <br /> landscaping,signs, existing and proposed utility services, and grading(refer to the"SITE PLAN <br /> CHECK LIST"for details). A fee is required for the Site Plan review. (Development Title Section 9- <br /> 884) <br /> b) APPROVED USE: This approval is for the expansion of an existing solid waste processing and <br /> recycling facility from 39.2 acres to 51.7 acres in two phases over twenty years with a maximum of <br /> 1,727 vehicles per day at final build out as shown on the Revised Site Plan dated June 22, 2011. (Use <br /> Type: Major Impact Services) Phase 1 to increase the daily waste capacity from 1,000 tons per day <br /> (TPD) to 1,800 TPD within ten years from the date of approval. Building permits for Phase 1 site <br /> improvements to be issued within eighteen months from the date of approval. <br /> i) Phase 1 site improvements will include: <br /> (1) Addition of 19,200 square feet to the existing 57,200 square foot material recovery facility <br /> and transfer station building, <br /> (2) Addition of 10,500 square feet to the existing maintenance and administration building, <br /> (3) Construction of a one mega-watt wood waste bio-mass gasification unit. <br /> (4) Construction of a 5,000 square foot covered storage area and loading dock <br /> ii) Phase 2 to increase the daily waste capacity from 1,800 TPD to 2,500 TPD within twenty years <br /> from the date of approval. An Improvement Plan for Phase 2 shall submitted 180 days prior to <br /> the increase in daily waste capacity. The Improvement Plan shall include a revised Solid Waste <br /> Facility Permit. <br /> iii) The project will employ 160 persons and operate 24 hours a day, 7 days a week. All outdoor <br /> processing activities will not begin before 6:00 am and will not operate after 10:00 pm. On site <br /> activities to include vehicle maintenance, equipment storage and truck parking, processing of <br /> construction and demolition of inert debris, chipping/grinding of wood waste, appliance <br /> recycling and associated waste handling activities. <br /> San Joaquin County PA-0800005\Tracy Material Recovery <br /> Community Development Page 9 <br />