Laserfiche WebLink
Implementing Timing of <br /> Mitigation Measure Method of Verification Party Verification Monitoring Pan <br /> • The operator maintains an Odor <br /> Impact Minimization Plan, as <br /> required under CCR Title 14, for its <br /> composting operations, which is <br /> regulated by the LEA, and includes <br /> an array of best management <br /> practices and odor mitigation <br /> measures, including: <br /> o limited holding times <br /> for composting <br /> feedstocks; <br /> o a covered, aerated <br /> system for composting <br /> of food materials; <br /> o suspension of <br /> materials handling <br /> during high wind <br /> events; <br /> o use of deodorants to <br /> mask or neutralize <br /> odors as needed; <br /> proper maintenance of site pavement <br /> and structural drainage elements, <br /> including treatment of process water; <br /> use of proper composting techniques <br /> for feedstock blending, pile construction <br /> and maintenance. <br /> San Joaquin County PA-0800005\Tracy Material Recovery <br /> Community Development Page 23 <br />