Laserfiche WebLink
Timing: Condition shall be met prior to issuance of building permits. <br /> 17. Energy Efficiency: All Town Center buildings shall be designed by architectural firms with staff <br /> accredited LEED designers on staff. This will ensure that energy efficiency is considered from the <br /> earliest stages of design with LEED standards as one of the guiding design goals. Some of the energy <br /> efficiency features that may be employed include the location, size and shading of commercial and <br /> office windows,the incorporation of operable windows in office and residential buildings, provisions on <br /> building roofs for the installation of solar water heating or photovoltaic panels and implementation of <br /> water conservation measures. <br /> 18. Walls and Fences: All implementing projects shall comply with the applicable provisions of the <br /> Master Plan, Specific Plan II,and other Community Approvals. <br /> 19. Public Art. Public Art(i.e. sculpture,fountains, entry monuments, murals, etc.)shall be incorporated <br /> into the development of public and private areas that are open to the general public. <br /> Timing: Improvement Plans approved by the Community Development Department and the Mountain <br /> House Community Services District prior to Final Map approval. <br /> 20. Community East Edge at Mountain House Parkway. With respect to the treatment of the <br /> Community East Edge at Mountain House Parkway,all implementing projects shall comply with the <br /> Master Plan,the Mountain House Community Services District Design Manual,and other Community <br /> Approvals. <br /> 21. PLEP Requirement: For the purposes of the Public Land Equity Program (PLEP), the public land <br /> dedication requirement for the Tentative Map is 31.04 acres,whereas the actual amount of qualifying <br /> PLEP public land is 74.67 acres. The resulting Public Land Surplus is, therefore,43.63 acres. The <br /> developer shall obtain a Voucher in the amount of 43.63 acres from the MHCSD. <br /> 22. Right To Farm Recordation And Notification: The deed of each parcel shall include the following <br /> recording notification, as specified by San Joaquin County Ordinance 4217 which added Section 6- <br /> 9004 et. seq. to Chapter 1 of Division 9 of the San Joaquin County Ordinance Code regarding the <br /> Right to Farm Notice: "All persons purchasing lots within the boundaries of this approved map should <br /> be prepared to accept the inconveniences or discomforts associated with agricultural operations or <br /> activities,such as noise, odors, insects,dust or fumes. San Joaquin County has determined that such <br /> inconveniencies or discomforts shall not be considered to be a nuisance" <br /> Timing: Prior to approval of Final Map(s). <br /> NOISE <br /> 23. Outdoor Noise Levels: Best available noise reduction measures shall be implemented by the <br /> applicant to reduce noise levels in primary outdoor use areas(backyards)of new residential <br /> development to an Ldn of 60 dB. The subdivider shall specify what additional, reasonable measures <br /> have been taken in this regard.Where it is not possible to reduce noise levels to this level using <br /> practical application of the best available noise reduction measures, an exterior noise level of up to <br /> 65 db may be allowed. [Master Plan Policy 11.3.1 (e)] In the case that noise levels cannot be <br /> reduced to the design noise level of 60 dB, the applicant must provide notice via a note on the deed <br /> of each lot stating that exterior noise levels may exceed 60 dB. <br /> Timing: Inclusion of note on the Final Map approved by CDD prior to Final Map approval, and <br /> inclusion of note on deed prior to issuance of building permits. <br /> 6 <br />