Laserfiche WebLink
Application Information Sheet "A" <br /> Storm Drainage <br /> Terminal Drainage to: Existing 60" storm drain line in Walker Street. <br /> Other: Detention basin to discharge into existing system <br /> Electricity and Natural Gas Providers <br /> Distance to Service: The closest gas main in on Main Street. Distance is dependent on <br /> where measurement is taken from, according to Robert Muldanado with PG&E. <br /> Existing Roads <br /> 1. Horner Ave- 50'ROW width, 24'pavement width,No curb, gutter, or sidewalk <br /> 2. Walker Lane -40'ROW width, 22'pavement width,No curb, gutter, or sidewalk <br /> 3. Main Street- 80'ROW width,24'pavement width,No curb, gutter, or sidewalk <br /> Proposed Roads <br /> 1. Homer Ave- 50'ROW width, 32'pavement width. Curb, gutter and sidewalk on <br /> project site side. <br /> 2. Walker Lane- 50'ROW width, 32'pavement width. Curb, gutter, and sidewalk <br /> on project site side. <br /> 3. Main Street- 84'ROW width, 60'pavement width. Curb, gutter, and sidewalk on <br /> project site side. <br /> 4. Street "A", Street "B", Street "C", and Court"D" - 50'ROW width, 32'pavement <br /> width. Curb, gutter, and sidewalk on both sides. <br />