Laserfiche WebLink
The initial start-up of the remedial wellfield occurred on March 9, 1992. Twelve extraction wells were <br /> operated intermittently during the period from March 9, 1992 through January 27, 1993. Initially,the <br /> Lremedial wellfield was operated using two alternate pumping cycles. In April 1993, the remedial <br /> wellfield pumpage was redistributed to allow for continuous non-cyclic pumping. <br /> Average pumping rates for reclamation wells for the period from July 1, 2004 through December 31, <br /> 2004 ranged from 0.5 gallons per minute(gpm) in well I-3 to 96 gpm in well EW-I (Table 2). The total <br /> volume of groundwater pumped from the wellfield from July 1,2004 through December 31, 2004 was <br /> approximately 112,605,000 gallons. The remedial wellfield pumpage volumes are summarized in Table <br /> 6. 2. <br /> i <br /> r. <br /> L <br /> L <br /> L <br /> L <br /> L <br /> 1 <br /> L <br /> I <br /> L <br /> L Marley Cooling Technologies 3909-09 <br /> Semi-Annual Groundwater Monitoring Report _ Dudek&Associates,Inc. <br /> October 1004/January 1005 -3- April 2005 <br /> L <br />