My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0003892 SSNL
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MANILA
>
250
>
2600 - Land Use Program
>
PA-0300461
>
SU0003892 SSNL
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2020 11:30:15 AM
Creation date
9/6/2019 10:02:19 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
FileName_PostFix
SSNL
RECORD_ID
SU0003892
PE
2622
FACILITY_NAME
PA-0300461
STREET_NUMBER
250
Direction
W
STREET_NAME
MANILA
STREET_TYPE
RD
City
LATHROP
APN
19112301
ENTERED_DATE
5/11/2004 12:00:00 AM
SITE_LOCATION
250 W MANILA RD
RECEIVED_DATE
9/9/2003 12:00:00 AM
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\M\MANILA\250\PA-0300461\SU0003892\SS STDY.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
LIMITATIONS AND UNIFORMITY OF CONDITIONS <br /> This report is issued with the understanding that it is the responsibility of the owner to transmit the <br /> information and recommendations of this report to developers, contractors, buyers, architects, <br /> engineers, and designers for the project so that the necessary steps can be taken by the contractors <br /> and subcontractors to carry out such recommendations in the field. The conclusions and <br /> recommendations contained in this report are solely professional opinions. <br /> The professional staff of ENGEO Incorporated strives to perform its services in a proper and <br /> professional manner with reasonable care and competence but is not infallible. There are risks of <br /> earth movement and property damages inherent in land development. We are unable to eliminate <br /> all risks or provide insurance; therefore, we are unable to guarantee or warrant the results of our <br /> work. <br /> This report is based upon field and other conditions discovered at the time of preparation of <br /> ENGEO's work. This document must not be subject to unauthorized reuse, that is, reuse without <br /> written authorization of ENGEO. Such authorization is essential because it requires ENGEO to <br /> evaluate the document's applicability given new circumstances, not the least of which is passage of <br /> time. Actual field or other conditions will necessitate clarifications, adjustments, modifications or <br /> other changes to ENGEO's work. Therefore, ENGEO must be engaged to prepare the necessary <br /> clarifications, adjustments, modifications or other changes before construction activities commence <br /> or further activity proceeds. If ENGEO's scope of services does not include on-site construction <br /> observation, or if other persons or entities are retained to provide such services, ENGEO cannot be <br /> held responsible for any or all claims, including, but not limited to claims arising from or resulting <br /> from the performance of such services by other persons or entities, and any or all claims arising <br /> from or resulting from clarifications, adjustments, modifications, discrepancies or other changes <br /> necessary to reflect changed field or other conditions. <br />
The URL can be used to link to this page
Your browser does not support the video tag.