Laserfiche WebLink
' r <br /> Further, hydraulic calculations to determine pipe size will be required for any design <br /> changes or relocations that are proposed on District facilities. In accordance with District <br /> standards, construction on District facilities is not allowed between February 15th and <br /> October 15th of any given year. As such,plans for pipeline improvements need to be <br /> received no later than mid-July(3 months before the end of water season), so that all <br /> construction work can be completed during the provided window period. <br /> 3. All improvements to the Districtfacilitiesshall comply with the District's current <br /> standards, drawings, and policies. The developer shall enter into the necessary <br /> agreements, permits, etc., required by the District for construction of District facilities. <br /> 4. District facilities within the development, or impacted,by the development, which provide <br /> storm water drainage or irrigation spill functions, shall not be abandoned, relocated,,or <br /> replaced, unless alternate provisions are made to handle such drainage in accordance with <br /> District approval. <br /> 5. The property owner and/or developer shall execute Irrigation Service Abandonment <br /> Agreements and provide for the removal of irrigation and drainage facilities and <br /> structures on property no longer requiring irrigation service. The method of abandonment <br /> and extent of such removal shall be determined by District. <br /> Private irrigation facilities and easements shall be provided for private use to <br /> accommodate property that will still be using District water to irrigate adjacent to the <br /> development. The proposed connection of any such private facility to District facilities <br /> shall be approved in advance by the District. <br /> 6. Easements for all District facilities shall be dedicated on current District forms. <br /> Additional easements shall be dedicated for access to all manholes and control structures. <br /> All District easements shall be shown on the final map together with the District's <br /> standard acknowledgment. Easements for pipelines shall be a minimum of 30 ft. in <br /> width. <br /> 7. Improvement plans for both off-site and on-site improvements shall be submitted for <br /> review and approval by the District's Board of Directors. Prior to plan submittal,the <br /> developer shall submit a retainer for plan check and inspections required for the project in <br /> accordance with the current established fee schedule. <br /> 8. Upon completion of the project, the developer shall provide one complete set of"As- <br /> Built" drawings to the District for its future use. <br /> 9. The following statement shall be affixed or otherwise included within the approved <br /> development plans: "SSJID has adopted time limits limiting the period of its approval <br /> should the landowner/developer fail to substantially complete his development project in <br /> a timely manner and as per approved development plans. <br />