Laserfiche WebLink
SAN JOAQUIN VALLEY UNIFIED AIR POLLUTION CONTROL DISTRICT <br /> Compliance Assistance Bulletin- December, 1994 <br /> Asbestos Synopsis <br /> Definitions Continued <br /> Ma[efaile yRACM/ s-Conemmng (1) Fnable asbesios-containing material IACM). <br /> (2) Category 1 nonfriable ACM in poor condition and "has become friable" or that has or <br /> will be subjected to sanding, grinding, cutting, or abrading. <br /> (3) Category II nonfnable ACM that has a high probability of becoming, or as become. <br /> crumbled, pulverized, or reduced to powder by the forces expected to act on the <br /> material in the course of demolition or renovation. <br /> Fnable Asbestos -Containing Any material containing more than 1 percent asbestos, as determined by Polarized Light <br /> Matenal lA CMC Microscopy (PLM) testing, which, when dry, can be crumbled, pulverized, or reduced to <br /> powder by hand pressure. <br /> Category I nonfriable ACM: Any asbestos-containing packings, gaskets, resilient floor coverings, and asphalt roofing <br /> products containing more than 1 percent asbestos as determined by PLM testing. <br /> Category/I nonfriable ACM: Any asbestos-containing materials, excluding Category 1 ACM, containing more than 1 <br /> percent asbestos as determined by PLM testing, which when dry, cannot be crumbled, <br /> pulverized, or reduced to powder by hand pressure. <br /> Inspection: done by, or under the direction of a Ca605HA certified consultant prior to: <br /> • Any regulated demolition. <br /> • Any renovation activity in which more than 160 sq. ft. of any building material or 260 linear feet of pipe insulation will be <br /> disturbed. An inspection is not required if the material to be disturbed is stipulated to be asbestos-containing and will be <br /> removed in accordance with the NESHAP. <br /> Inspection Re on Must Include. <br /> •A schematic showing the location of all tested materials. <br /> • The following data for all asbestos-containing materials: <br /> 1. The amount and description of each material. <br /> 2. Percent asbestos content. <br /> 3. Whether or not the materiel is friable. <br /> Notification: An asbestos notification must be submitted to the District at least 10 working days prior to: <br /> 1. Any regulated demolition <br /> 2. Any renovation in which mole than 160 sq. ft. or 260 linear ft. o1 RACM will be disturbed. <br /> A copy of the Askew"Inspection Report must be included with the Nodficadon. <br /> Iconhcauon wii. not pe considered compiate, nor will the 10 working day notice period begin unti! al! required infe:manor 'rd <br /> fees and fees have been submitted to the District. <br /> Fees: District Rule 3050 requires that nonrefundable asbestos fees be received along with asbestos lob notifications. Fees must <br /> be paid for regulated asbestos abatement projects and regulated demolition projects, whether or not asbestos is present. <br /> Demolition Release Form: The California Health and Safety Code requires that the city or county building official have proof of <br /> compliance with, or exemption from, the asbestos notification requirement before he or she issues a demolition permit. <br /> After the District has received a demolition notification and is satisfied that the NESHAP notification requirements have been <br /> complied with, the District will ;slue a Demolition Release Form to the person who submitted the notification. <br /> Recycling and Waste Disposal. -The asbestos notification must also identify any building materials which will be recycled after <br /> removal from a project. The name of the recycling contractor and location of such activity must be identified. <br /> For additional information, please contact the Compliance Division of your nearest regional office: <br /> Northern Region Central Region Southem Region <br /> 4230 Kiernan Avenue, Suite 130 1990 East Gettysburg Ave. 2700 M Street, Suite 275 <br /> Modesto CA 95356-9321 Fresno CA 93726 Bakersfield CA 93301-2370 <br /> (209) 557b100 (559) 230-5950 (661) 32"900 <br /> JM h:lcegajoan\asbstosl.syn <br />