Laserfiche WebLink
"101 07 16:53 2094640136 ENVIRONMENTAL HEALTH PAGE 02106 <br /> W± SAN JOAQUIN COUrDTY <br /> g <br /> EwiRONMIENTAL HEALTH DEPARTMENT <br /> 600 East Mstn Street Stockton, California 95202 <br /> October 16 2t� 7k <br /> A <br /> i qk <br /> To F San Joaquin County Commuttity Development Department <br /> 1LLrarm: San Joaquin County Environmental Health-Department£, , <br /> -a <br /> . <br /> Contact Persona_ Ted fasiopaulos, Senior REHS,Phone: (209) 953-7698 <br /> Re; 1PA-0700441,(SA),SU0006757 <br /> 8853 S.. ntheylltoad,Frenc;i Camp ; <br /> Attentien- Me)Efate#' <br /> The San Joaquin County Development Title requirements listed below have been identified as <br /> pertinent to this project. Other requirements may also apply. These�uiiremerts may not be <br /> modified. <br /> A. An addendum to the soil suitability/nitrate loading study dated February 28,2007,shall be <br /> submitted to the San Joaquin County Environmental Health Department(Ek1<D),which <br /> incorporates proposed employee and customer use, and indicates that the area is suitable for <br /> septic(onsite wastewater treatment)'ystern usage. The soil suitability/nitrate loading study <br /> and addendum must be approver)by the EHD prior to'issuance of any building permit(s). <br /> (San Joaquin County Development'Title, Section 9-1105.2(d)). A review fee of$490.00 <br /> must be paid at time of submittal to the EHD. <br /> The onsite wastewater treatment system shall comply with the San Joaquin County Onsite <br /> Sewage Standards. A percolation test demonstrating compliance with the absorption rates of <br /> the Manual of Septic Tank Practice or USEPA Design Manual For Onsite Wastewater <br /> Treatment and Disposal Systems is required for each parcel. A percolation test permit fee of <br /> $98.00 per percolation bole is required. <br /> B. Revised site plans must be submitter)to the EHD showing the maximum number of <br /> employees and customers for wbicbthe sewage(onsite wastewatertreatment)system is being <br /> designed. The revised site plans must show that the leach field area will be barricaded so that <br /> it cannot be driven over,parked on,or used as a storage area- In addition,the revised site <br /> plans shall show a leach field replacement area equal to 1000/9 of the designed disposal area. <br /> The leach field area shall only be used for that specific purpose,and it may not contain any <br /> underground utility lines(San Joaquin County Development Title, Section 9-111.0A(c)(5)). <br /> C. A water supply well shall be constructed under permit and inspection of the EHD prior to <br /> occupancy. Should the number of nonresident individuals exceed 24 for at least 60 days per <br /> year,or should the number of service connections exceed four,a small public water system <br /> permit must be obtained from the EHD (San Joaquin County Development Title, Sections 9- <br /> 1120.2 and 9-1115.9.). <br />