Laserfiche WebLink
Kerry Sullivan -2- <br /> COMMENTS ON DEVELOPMENTS <br /> SA-01-39 <br /> 4. The Water Supply Facilities Impact Mitigation Fee may be required for this development. <br /> The fee is due and payable prior to issuance of the building permit. (The fee currently is <br /> $667.00 per 1,000 gross square foot of building designated as manufacturing. The fee <br /> shall be automaticalll, increased on January 1 of each year through the year 2005 at the <br /> rate of 7.66 percent. A credit may be allowed if it can be verified that the existing <br /> development on this >ite was in operation on or after April 30, 1991.) <br /> (Development Title Section 9-818.4 and Resolutions R-91-327, R-94-185 and R-97-5) <br /> 5. A copy of the Final Site Plan shall be submitted prior to release of building permit. <br /> 6. Verification shall be cbtained from the Solid Waste Division (468-3066) that this <br /> development has me: the requirements of the Waste Plan Format for Development <br /> Projects. Final Site Flan is required upon submittal of verification. <br /> 7. The owner shall execute an Irrevocable Offer and Agreement to Dedicate Road to result <br /> in a fifty-five (55) foot wide right-of-way from the centerline of Mariposa Road to the <br /> property line across the parcel's frontage. (A $280.00 fee currently is required for <br /> processing per Development Title Table 9-240.2 In addition to a copy of the Grant Deed <br /> and a legal description of the parcel to be offered for dedication.) (The fee due will be <br /> based on the current fee schedule.) (Development Title Section 9-1150 5) <br /> NOTE: No landscaping shall be allowed in the County road right-of-way. <br /> GK:BN:wc <br /> PS-IE143-WlA <br />