Laserfiche WebLink
Kerry Sullivan -2- <br /> COMMENTS ON DEVELOPMENTS <br /> SA-01-39 <br /> 4. The Water Supply Facilities Impact Mitigation Fee may be required for this development. <br /> The fee is due and payable prior to issuance of the building permit. (The fee currently is <br /> $184.00 per 1,000 gross square foot of building designated as manufacturing. The fee <br /> shall be automatically increased on January 1 of each year through the year 2005 at the <br /> rate of 7.66 percent. A credit may be allowed if it can be verified that the existing <br /> development on this site was in operation on or after April 30, 1991.) <br /> (Development Title Section 9-818.4 and Resolutions R-91-327, R-94-185 and R-97-5) <br /> 5. A copy of the Final Site Plan shall be submitted prior to release of building permit. <br /> 6. Verification shall be obtained from the Solid Waste Division (468-3066) that this <br /> development has met the requirements of the Waste Plan Format for Development <br /> Projects. Final Site Plan is required upon submittal of verification. <br /> NOTE: No landscaping shall be allowed in the County road right-of-way. <br /> GK:BN:wc <br /> PS-1E143-W1A <br />