Laserfiche WebLink
http://2imbra/zimbra/h/printnessage?id=13776 <br /> Zimbra sstowers@sjgov.org <br /> Oldcastle Precast, Inc. PA-1400203(SA) - City of Stockton comments <br /> From :Todd Greenwood Wed, Nov 05, 2014 04:38 PM <br /> <Todd.Greenwood@stocktongov.com> <br /> Subject : Oldcastle Precast, Inc. PA-1400203(SA) - City of <br /> Stockton comments <br /> To : Stephanie Stowers <sstowers@sjgov.org> <br /> Cc : Eric Alvarez <Eric.Alvarez@stocktongov.com>, <br /> Michael McDowell <br /> <M ichael.M.-Dowell@stocktongov.com> <br /> Stephanie Stowers, <br /> The following are City of Stockton comments related to PA-1400203 (SA): <br /> 1) A traffic signal is being constructed at Mariposa Road/Stagecoach Road as part of <br /> the State Route 99 Widening project (Caltrans). <br /> It is our understanding that Caltrans has been working with the property owner to have <br /> a driveway at Stagecoach Road (will be fourth leg of traffic signal). As part of that <br /> driveway, a gate across the driveway has been discussed. If there is a gate proposed, <br /> it will need to be set back away from Mariposa Road -- to allow reaction time for <br /> motorists entering the driveway on a green light and encountering a gate (safety). <br /> The City will be responsible for operations at the traffic signal, and therefore, will need <br /> to concur on the location of the gate (if there is to be one) <br /> The site plan depicts a proposed Office building near the Stagecoach Road driveway. <br /> Given the depicted location, it would not allow enough room for a gate nor would it <br /> allow for adequate turning area of trucks/vehicles using the driveway. <br /> 2) It is our understanding that maintenance/operation costs associated with the project <br /> driveway (Mariposa/Stagecoach) portion (25% of traffic signal) would possibly be paid <br /> via an annuity set up through Caltrans. Please confirm that this is the case. <br /> 3) For the City to provide complete comments, all access changes will need to be clearly <br /> defined. Do the existing Mariposa Road driveways at the west end and east end of the <br /> Site remain open? Or is all site traffic to be through Stagecoach Road traffic signal? <br /> Thank you for the opportunity to comment on the subject project. <br /> Please confirm, by return email, that you have received these comments. <br /> of 11/06/2014 10:29 AM <br />