Laserfiche WebLink
C� F9ry <br /> THOMAS M. GAU R o. BOX ST 1810 O 1810 E. FORMAKAZELTON AVENUE <br /> DIRECTOR ,L'�"� L/, <� STO 68-300 CALIFORNIA 93201 <br /> n (208)468.3000 FAX(209)468-2999 <br /> a (.(' i w .sl9ov.o!gtpubwolks <br /> FRITZ BUCHMAN <br /> DEPUTY DIRECTOR 1 <br /> MICHAEL SELLING ��' 'i�y ".t2't• -you <br /> DEPUTY DIRECTOR <br /> JIM STONE /� r� <br /> DEPUTY DIRECTOR RECPV(• ) <br /> ROGER JANES <br /> BUSINESS ADMINISTRATOR <br /> FEB " J ?u:4 <br /> San Joaquin G <br /> Community Development <br /> February 3,2014 <br /> MEMQRANDUM <br /> TO: John L. Funderburg, Principal Planner <br /> Community Development Department <br /> CONTACT PERSON: Stephanie Stowers <br /> FROM: Alex Chetley, Engineering Services Manager Y1 V <br /> Development Services Division <br /> SUBJECT: PA-1300220; A Site Approval pre-application for the addition of 17,000 square-foot warehouse and <br /> a 750 square-foot tool room and the demolition of a 3,288 square-foot building for the expansion of <br /> an existing agricultural warehousing operation; located at the northwest corner of the intersection of <br /> Mariposa Road and Austin Road, east of Stockton. (Supervisorial District 1) <br /> PROPERTY OWNER: Craig and Gina Podesta Trust APPLICANT: Roland Construction <br /> ADDRESS: 7367 E. Mariposa Road, Stockton APN: 179-220-04 <br /> INFORMATION: <br /> 'The site is not currently located within a Federal Emergency Management Agency Designated Flood Hazard Area. <br /> Mariposa Road has an existing right-of-way width of 80 feet and is within the Stockton City Limits. <br /> RECOMMENDATIONS: <br /> 1. The Traffic Impact Mitigation Fee shall be required for any incremental traffic resulting from this application. <br /> The fee is due and payable at the time of building permit application. The fee shall be automatically adjusted <br /> July I of each year by the Engineering Construction Cost Index as published by the Engineering News <br /> Record. (Resolution R-00-433) <br /> 2. The Regional Transportation Impact Fee shall be required for any incremental traffic resulting from this <br /> application. The fee is due and payable at the time of building permit application. The fee will be based on <br /> the current schedule at the time of payment. (Resolution R-06-38) <br />