My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0007121
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MCDONALD
>
10450
>
2600 - Land Use Program
>
PA-0800111
>
SU0007121
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2020 11:32:54 AM
Creation date
9/6/2019 10:08:54 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0007121
PE
2606
FACILITY_NAME
PA-0800111
STREET_NUMBER
10450
Direction
W
STREET_NAME
MCDONALD
STREET_TYPE
RD
City
STOCKTON
APN
13106001
ENTERED_DATE
4/9/2008 12:00:00 AM
SITE_LOCATION
10450 W MCDONALD RD
RECEIVED_DATE
4/8/2008 12:00:00 AM
P_LOCATION
99
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\M\MCDONALD\10450\PA-0800111\SU0007121\APPL.PDF \MIGRATIONS\M\MCDONALD\10450\PA-0800111\SU0007121\CDD OK.PDF \MIGRATIONS\M\MCDONALD\10450\PA-0800111\SU0007121\EH COND.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
-f <br /> (4) Have an average elevation of the natural of no less than the average elevation of the natural <br /> grade of the surrounding land. The average elevation of the natural or existing grade shall be the <br /> average elevation of all land 100 feet from the perimeter of the proposed excavation, excluding <br /> any portion of the perimeter adjacent to a river, river-bank, levee, public road, railroad, canal, <br /> pipeline, or other similar uses or rights-of-way. <br /> f. EROSION CONTROL: Protective vegetative planting, silt screen dams, or other approved methods <br /> shall be required where necessary for the control of erosion. An erosion and sediment control plan <br /> approved by Development Services Division shall be part of the reclamation plan. (Development Title <br /> Section 9-1410.3[m]) <br /> g. HOURS OF OPERATION: Excavation operations shall not be carried on during the hours from 9:00 <br /> p.m. and 5:00 a.m. (Development Title Section 9-1410.3(d)). <br /> h. LIGHTING: Any night lighting established on the property shall be arranged and controlled so as not <br /> to illuminate public right-of-way or adjacent properties. (Development Title Section 9-1410.3(e) <br /> i. EMISSIONS:All emissions shall be subject to the rules and regulations of the San Joaquin Valley Air <br /> Pollution Control District. (Development Title Section 9-1410.3(f) <br /> j. WEED CONTROL: If noxious weeds are on the site, operations shall be in accordance with <br /> instructions from the Agricultural Commissioner of San Joaquin County. (Development Title Section <br /> 9-1410.3[h]) <br /> k. HEALTH CONSIDERATIONS: Excavations shall not cause health or sanitary hazards and shall not <br /> create conditions which will cause the breeding or increase of mosquito's, rodents, or other pests. <br /> (Development Title Section 9-1410.3(i) <br /> I. COMMENCEMENT OF WORK: A written notification of work schedules shall be provided to the <br /> County by the applicant prior to initiating any grading or excavation. (Development Title Section <br /> 9-1410.30) <br /> m. CERTIFICATION OF COMPLIANCE: At the completion of the grading, the applicant shall have a <br /> registered civil engineer or licensed surveyor compare the excavation's final elevations with the <br /> approved permit. The engineer or surveyor shall submit a certified, written finding to the Building <br /> Official which states and documents the compliance or noncompliance of the excavation with the <br /> approved permit. (Development Title Section 9-1410.3(k) <br /> n. EXCAVATION/RECLAMATION SCHEDULE: The reclamation plan shall show the phases of <br /> excavation. Reclamation on one phase of an excavation shall be initiated prior to the start of the next <br /> excavation phase. The final reclamation of any phase of excavation shall be completed within two <br /> years of the commencement of the reclamation process. Excavation shall be limited so that at any <br /> point of time a maximum of one phase is being reclaimed while one phase is being excavated. <br /> (Development Title Section 9-1410.3[n]) <br /> o. TIME LIMITATION: The Agricultural Excavation Permit shall expire 3 years from the date of <br /> approval as indicated on the reclamation plan dated March 26, 2008. <br /> p. ANNUAL INSPECTION REPORTS: Annual inspections of the excavation shall be conducted by the <br /> County to ensure compliance with the conditions of the permit and the reclamation plan. The County <br /> may use professional services as provided for in Section 9-240.11. The consultant shall be selected <br /> by San Joaquin County. Upon completion of the annual inspection, the person in charge of the <br /> mining operation shall submit to the State Geologist and the County a report which shall contain all <br /> Conditions of Approval -2 - PA-0800111 <br />
The URL can be used to link to this page
Your browser does not support the video tag.