My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0011373
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MCKINLEY
>
11168
>
2600 - Land Use Program
>
PA-1700109
>
SU0011373
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2020 11:35:08 AM
Creation date
9/6/2019 10:09:20 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0011373
PE
2632
FACILITY_NAME
PA-1700109
STREET_NUMBER
11168
Direction
S
STREET_NAME
MCKINLEY
STREET_TYPE
AVE
City
FRENCH CAMP
Zip
95231-
APN
19332020
ENTERED_DATE
6/1/2017 12:00:00 AM
SITE_LOCATION
11168 S MCKINLEY AVE
RECEIVED_DATE
5/30/2017 12:00:00 AM
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\M\MCKINLEY\11168\PA-1700109\SU0011373\APPL.PDF \MIGRATIONS\M\MCKINLEY\11168\PA-1700109\SU0011373\CDD OK .PDF \MIGRATIONS\M\MCKINLEY\11168\PA-1700109\SU0011373\EHD COND.PDF \MIGRATIONS\M\MCKINLEY\11168\PA-1700109\SU0011373\MISC.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
-2- <br /> Mo Hatef <br /> Community Development Department <br /> PA-1700109(SA) <br /> 5. The developer shall provide drainage facilities in accordance with the San Joaquin County Development <br /> Standards. Retention basins shall be fenced with six(6)foot high chain link fence or equal when the <br /> maximum design depth is 18 inches or more. Required retention basin capacity shall be calculated and <br /> submitted along with a drainage plan for review and approval, prior to release of building permit. <br /> (Development Title Section 9-1135) <br /> 6. This project falls within the definition of a Regulated Project as defined in either the County Post- <br /> Construction Standards Manual or the County Phase II National Pollutant Discharge Elimination System <br /> (NPDES)permit and shall comply with the following conditions: <br /> a. A registered professional engineer shall design a system or combination of systems to infiltrate,treat, <br /> and/or filter the 85th percentile storm as defined in the County's Post-Construction Standards Manual. <br /> The system design shall follow standards as outlined in the 2009 Storm Water Quality Control <br /> Criteria Plan or in the"California Association of Stormwater Quality Agencies"(CASQA) <br /> publications and comply with the conditions of the County Phase II NPDES permit. CASQA <br /> documents are available at www.casga.org <br /> b. Owner shall submit a"Storm Water Pollution Prevention Plan"(SWPPP)to Public Works for review. <br /> A SWPPP preparation guide is available at the Department of Public Works. A copy of the SWPPP <br /> shall be maintained on the construction site and presented to any County, State or Federal employee <br /> on demand. The SWPPP onsite shall include all required records,updates,test results and inspections. <br /> The post construction chapter of the SWPPP must identify expected pollutants and how they will be <br /> prevented from entering the storm system. The chapter shall also contain a maintenance plan,a spill <br /> plan,and a training plan for all employees on proper use,handling and disposal of potential <br /> pollutants. The example plans are available in the CASQA handbooks. <br /> c. A Maintenance Plan shall be submittedandthe execution of a Maintenance Agreement with San <br /> Joaquin County shall be required for the owner/operator of stormwater controls prior to the release of <br /> the building permit. <br /> d. Owner shall be responsible for providing the County with an annual report of operation and <br /> maintenance of any system.The property owner shall also be responsible for the payment to the <br /> County of an annual system inspection fee established by Resolution of the Board of Supervisors. <br /> e. Standard Best Management Practices,for the type of development proposed,shall be incorporated <br /> into the site design. <br /> f. Wastewater shall NOT be allowed into the storm drainage system. <br /> Informational Notes: <br /> (i.) Future expansion of the site may require a Traffic Impact Study. <br /> (ii.) A Solid Waste Diversion Plan for all applicable projects must be submitted to the Building Division of <br /> the Community Development Department prior to issuance of the building permit. Contact the Solid <br /> Waste Division(468-3066)for information. <br />
The URL can be used to link to this page
Your browser does not support the video tag.