My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0000564
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MCMULLIN
>
4430
>
2600 - Land Use Program
>
MS-91-89
>
SU0000564
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/1/2019 4:52:28 PM
Creation date
9/6/2019 10:09:45 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0000564
PE
2622
FACILITY_NAME
MS-91-89
STREET_NUMBER
4430
Direction
E
STREET_NAME
MCMULLIN
STREET_TYPE
RD
City
MANTECA
ENTERED_DATE
9/21/2001 12:00:00 AM
SITE_LOCATION
4430 E MCMULLIN RD
QC Status
Approved
Scanner
SJGOV\sballwahn
Supplemental fields
FilePath
\MIGRATIONS\M\MCMULLIN\4430\MS-91-89\SU0000564\CDD OK.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MOBILEHOME INSTALLATION & OCCUPANCY <br /> REQUIREMENTS <br /> MOBILLIIOME1NSTALI"ON REQUIREMENTS .. <br /> Utility Pad <br /> .- MD8ILENOME <br /> �rll.Ij1E5 <br /> � E <br /> AX <br /> 2 O" X 4-0" CONC.PAD <br /> LOCATED /N BACK HALF <br /> j OF MOSILEHOME <br /> ✓r ILF <br /> 'YO <br /> wau <br /> earAAZT c.s <br /> wrmc "\ <br /> _ a e <br /> UUXR CUj^G TI i �. <br /> CFLY(L7 <br /> rtz <br /> ^ 3 REDWOOD <br /> ,- - .. I, —POSr <br /> WA .:: GAS \ I 6'MAX. <br /> EL£LI c" <br /> GAS <br /> ME r£R <br /> DETAIL <br /> • Location. The utility pad shall be located in the rear '/z of the mobilehome and not less than 1' nor more than 4' <br /> from the wall. <br /> • Size and Sequence. The utility pad shall be 3-1/2'thick concrete and surround the equipment base by not less <br /> than 6'. The sewer, electric, gas and water may be in any sequence. <br /> • Electrical and Gas Supports. The electrical panel and gas meter supply line must be supported by a 4'X 4'X 2' <br /> of treated wood,wood naturally resistant to decay or any approved pedestal assembly. <br /> • Electrical Panel. The bottom of the electric panel shall be 24' above the concrete. A disconnect is required at the <br /> pedestal if the main service is more than 50' or not in sight of the mobilehome. <br /> • Water Service. The water supply valve shall be 12' above the concrete. A hose bib with vacuum breaker and <br /> shut-off valve is required. The water line shall be pressurized at 45 p.s.i. at the pedestal. <br /> • Sewer Connection. The drain inlet must include a Calder Coupler at the sewer inlet. <br /> • Gas Meter. The gas supply shall be pressurized to 10 p.s.i. Transition fittings shall be used when connecting <br /> metal gas piping to P.V.C. Ferrous gas piping installed underground shall be protected from corrosion by <br /> approved coatings or wrappings, machine applied conforming to recognized standards. Field wrapping is <br /> restricted to short sections and fittings. Double wrapping is required. <br /> • Burying Requirements. Utilities must be buried as follows: <br /> Sewer 12' deep <br /> Rigid Gas 12' deep <br /> P.V.C. gas 18' deep <br /> Direct buried conductors 24' deep <br /> Rigid metal conduit 6' deep <br /> Rigid non-metallic conduit 18' deep <br /> OTHER INSTALLATION REQUIREMENTS <br /> • Skirting. Skirting constructed of the same materials as the mobilehome shall be installed. <br /> • Additions. No permanent room additions are allowed, but patio covers or screened porches constructed of the <br /> same materials as the mobilehome are permitted. <br /> • Flood Areas. Within 100-year flood areas mobilehomes must be elevated so that the lowest habitable floor is at <br /> least 1' above the 100-year flood elevation and shall be anchored in accordance with present mobilehome tie down <br /> standards. <br /> • Preinspection Required. A preinspection will be done, prior to building permit issuance, on all mobilehomes built <br /> prior to September 15, 1971. You may request an inspection at the building department counter. The fee is <br /> $95.00. Mobilehomes built prior to 1958 will not be allowed. Mobilehomes built after 1958 without an HCD insignia <br /> will not be allowed. <br /> • Inspections Required. The mobilehome is not to be occupied until it has been inspected and approved. <br />
The URL can be used to link to this page
Your browser does not support the video tag.