My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0004926 SSNL
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MEZA
>
515
>
2600 - Land Use Program
>
PA-0500119
>
SU0004926 SSNL
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2020 11:31:20 AM
Creation date
9/6/2019 10:10:32 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
FileName_PostFix
SSNL
RECORD_ID
SU0004926
PE
2622
FACILITY_NAME
PA-0500119
STREET_NUMBER
515
Direction
S
STREET_NAME
MEZA
STREET_TYPE
CT
City
LINDEN
APN
18332087
ENTERED_DATE
3/18/2005 12:00:00 AM
SITE_LOCATION
515 S MEZA CT
RECEIVED_DATE
3/15/2005 12:00:00 AM
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\M\MEZA\515\PA-0500119\SU0004926\SS STDY.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Reference Point (RP) Reference Point (RP) <br /> Original Ground (OG) Original GFGmd (OG) <br /> Drill 6' dia. hole <br /> N <br /> 1 <br /> V 4 da. PVC pipe i <br /> a <br /> Drill 4' din. hole 00 <br /> N <br /> 2' dia. PVC pipe <br /> Drill 1/4" holes in PVC pipe 0 0 o i <br /> e <br /> 00 0 <br /> ` oo o x r'1 <br /> O r Gravd sine 1/4'to 3/8- : 00 00 0; <br /> 000. a <br /> r f� 0 a 0: N Z <br /> N 4 • _a 0 0 <br /> r1 2' Min. Gravel <br /> yr <br /> Threaded or Glued-- <br /> Connection <br /> I Connection Joint SHALLOW HOLE (6"dia.) <br /> ` NIS <br /> lift Hole t <br /> A. <br /> V.b . tj <br /> (�N <br /> Drill 1/4" holes in PVC pipe via r7 0} v <br /> Gravel size 1/4-to 3/8' <br /> m <br /> 2' Min. Gravel <br /> DEEP HOLE (4"dia.� <br /> NTS <br /> 1. Sleeve the hole with PVC pipe and gravel as soon as <br /> possible after drilling. <br /> 2. Measure depth prior to release of driller_ Deep holes <br /> holes mist be cleaned out by the driller. Shallow, <br /> holes (42' deep) can be cleaned out with 4' auger. <br /> 3. O.IL to place more gravel on the exterior of the <br /> PVC Sleeve, than the minimum that is shown. <br /> r 4. Use a funnel to pour water into the PVC pipe. <br /> SQ 1VO- J 6' 6(-C1 A FA oj— I I <br /> ENGINEER: Earnest F. Smith IHOLE PREPARATION (Deep/ShalloW) APN: /2'3-.32-o -PERCOLATION TESTS DATE: - o —p r <br />
The URL can be used to link to this page
Your browser does not support the video tag.