DOWN-SLOPE WIDTH(1) <br /> Mound side slope of 3:1. <br /> Height of mound=(4 in. Peat material, 12 in. Sand Fill+9 in.Aggregate Absorption Area +6 in. avg.soil cap <br /> thickness) <br /> Height= 3 horizontal x 3.2 ft. vertical= 10.5 ft. Use 10 ft <br /> OVERALL LENGTH AND WIDTH(L+W) <br /> L= 130ft <br /> W=5011 <br /> SOIL COVER <br /> The soil cover may consist of on-site silty clay surface soil (USCS =cl, ml) material. As <br /> referenced,the slopes must not exceed 3:1, which will place the height of the mound at <br /> approximately 2.5 feet higher than surrounding grade. <br /> D. MOUND SYSTEM OPERATIONAL COMPONENTS <br /> CONFIGURATION OF PRESSURE DISTRIBUTION NETWORK <br /> The distribution piping must discharge the effluent uniformly over the drain rock bed,with five-foot spaced <br /> orifices so that effluent application area is -4 ft'/orifice. Force main(transport line)piping will be to <br /> center-feed manifold. Laterals connect to the manifold by"cross construction" and not"tee-to-tee." <br /> There will be a total of eight laterals- four on each side of the manifold,three feet apart. Orifices shall be <br /> drilled with a sharp drill and installed facing up,with orifice shields. Clean-outs at the distal ends of the <br /> eight laterals will extend upward towards the ends of the mound with control valves at the"turn-up"and <br /> with access boxes, as described on the Plans. <br /> LATERAL LENGTH AND DIAMETER <br /> Piping to consist of PVC Schedule 40. Lateral length shall be 50 ft for each lateral, including the 1 inch clean- <br /> out sweep assembly. The diameter shall be 1 inch I.D. <br /> PERFORATION SIZE,SPACING AND NUMBER PER LATERAL <br /> Perforations shall be 1/8 in. dia. For effluent distribution applications to be -4 ft'/orifice,the spacing of <br /> perforations= 5 feet. The number of perforations per lateral shall be: <br /> N=(p-x)+0.5 =(50 ft -. 5 ft)+0.5 = 11 perforations per lateral x 8 laterals= 88 total perforations <br /> LATERAL DISCHARGE RATE (LDR) <br /> Required distal pressure is 5 ft,translates to 0.43 gpm per orifice. LDR=0.43 gpm/perforation x 11 <br /> perforations/lateral =4.73 gpm/lateral. <br /> MANIFOLD AND FORCE MAIN DIAMETER <br /> The force main and manifold shall be 2.0 in. I.D., composed of PVC Schedule 40. <br /> NETWORK DISCHARGE RATE(NDR) <br /> NDR= 8 laterals x 4.73 gpm/lateral=38 gpm. <br /> TOTAL DYNAMIC HEAD(TDH) <br /> An estimate of the TDH is provided assuming a total distance of 250 feet from the dosing chamber to the <br /> end distribution network for the primary mound system. The TDH the pump must work against: <br /> 15 <br /> Chesney Consulting <br />