Laserfiche WebLink
S J C O G, Inc. <br /> 555 East Weber Avenue • Stockton,CA 95202 • (209)235-0600 • FAX(209)235-0438 <br /> San Joaquin County Multi-Species Habitat Conservation&Open Space Plan (SJMSCP) <br /> SJMSCP RESPONSE TO LOCAL JURISDICTION(RTLJ) <br /> ADVISORY AGENCY NOTICE TO SJCOG,Inc. <br /> To: Megan Aguirre,San Joaquin County,Community Development Department <br /> From: Laurel Boyd, SJCOG, Inc. <br /> Date: March 5,2014 <br /> Local Jurisdiction Project Title: N/A <br /> Assessor Parcel Number(s): 239-030-03 <br /> Local Jurisdiction Project Number: PA-1300190(SA) <br /> Total Acres to be converted from Open Space Use: 0.25 acres <br /> Habitat Types to be Disturbed: Agricultural Habitat Land <br /> Species Impact Findings: Findings to be determined by SJMSCP biologist. <br /> Dear Ms.Aguirre: <br /> SJCOG, Inc. has reviewed the application referral for PA-1300190 (SA). This project consists of a Site Approval <br /> application to expand an existing gas station and convenience market to include demolition of an existing 720 square foot <br /> convenience store, construction of a 2,600 square foot convenience store, and relocation of an existing 186 square foot <br /> storage building. The existing 2,494 square foot canopy to remain in use. The project site is located on the northwest <br /> corner of Mossdale Road, and the 1-5 northbound on-ramp, Lathrop (APN/Address: 239-030-03; 444 Mossdale Road, <br /> Lathrop). <br /> San Joaquin County is a signatory to San Joaquin County Multi-Species Habitat Conservation and Open Space Plan <br /> (SJMSCP). Participation in the SJMSCP satisfies requirements of both the state and federal endangered species acts, <br /> and ensures that the impacts are mitigated below a level of significance in compliance with the California Environmental <br /> Quality Act (CEQA). The LOCAL JURISDICTION retains responsibility for ensuring that the appropriate Incidental Take <br /> Minimization Measure are properly implemented and monitored and that appropriate fees are paid in compliance with the <br /> SJMSCP. Although participation in the SJMSCP is voluntary, Local Jurisdiction/Lead Agencies should be aware that if <br /> project applicants choose against participating in the SJMSCP, they will be required to provide alternative mitigation in an <br /> amount and kind equal to that provided in the SJMSCP. <br /> This Project is subject to the SJMSCP. This can be up to a 30 day process and it is recommended that the project <br /> applicant contact SJMSCP staff as early as possible. It is also recommended that the project applicant obtain an <br /> information package. http://www.sicog.orq <br /> Please contact SJMSCP staff regarding completing the following steps to satisfy SJMSCP requirements: <br /> • Schedule a SJMSCP Biologist to perform a pre-construction survey prior to any ground disturbance <br /> • SJMSCP Incidental take Minimization Measures and mitigation requirement: <br /> 1. Incidental Take Minimization Measures(ITMMs)will be issued to the project and must be signed by the project applicant prior to any <br /> ground disturbance but no later than six(6)months from receipt of the ITMMs. If ITMMs are not signed within six months,the applicant <br /> must reapply for SJMSCP Coverage. Upon receipt of signed ITMMs from project applicant,SJCOG,Inc.staff will sign the ITMMs. This <br /> is the effective date of the ITMMs. <br /> 2 Under no circumstance shall ground disturbance occur without compliance and satisfaction of the ITMMs. <br /> 3. Upon issuance of fully executed ITMMs and prior to any ground disturbance,the project applicant must: <br /> a. Post a bond for payment of the applicable SJMSCP fee covering the entirety of the project acreage being covered(the bond <br /> should be valid for no longer than a 6 month period),or <br /> b. Pay the appropriate SJMSCP fee for the entirety of the project acreage being covered;or <br /> C. Dedicate land in-lieu of fees,either as conservation easements or fee title,or <br /> d. Purchase approved mitigation bank credits. <br /> 4. Within 6 months from the effective date of the ITMMs or issuance of a building permit,whichever occurs first,the project applicant must: <br /> a. Pay the appropriate SJMSCP for the entirety of the project acreage being covered;or <br />