Laserfiche WebLink
r., <br /> E. Construction of individual sewage disposal system(s)under permit and inspection by the <br /> Environmental Health Department is required at the time of development based on the Soil <br /> Suitability findings (San Joaquin County Development Title, Section 9-1110.3 & 9-1110.4). <br /> F. Should the number of non-resident individuals exceed 24 for at least 60 days per year, or the <br /> number of service connections exceed four, a yearly permit to operate a public water system <br /> will be required by the Environmental Health Department(San Joaquin County Development <br /> Title, Section 9-1120.2 and 9-1115.9.). <br /> The supplier must possess adequate financial, managerial,and technical capability to assure <br /> delivery of pure, wholesome, and potable drinking water in accordance with San Joaquin <br /> County Development Title, Sections 9-1120.2 and 9-1115.9 and C.C.R., Title 22, and Health <br /> and Safety Code, Section 116525 through 116570. <br />