My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0011925
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MOUNTAIN HOUSE
>
22261
>
2600 - Land Use Program
>
PA-0500838
>
SU0011925
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/9/2022 11:55:37 AM
Creation date
9/6/2019 10:17:37 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0011925
PE
2656
FACILITY_NAME
PA-0500838
STREET_NUMBER
22261
Direction
S
STREET_NAME
MOUNTAIN HOUSE
STREET_TYPE
PKWY
City
MOUNTAIN HOUSE
Zip
95391-
APN
20906065, -66, -67
ENTERED_DATE
9/11/2018 12:00:00 AM
SITE_LOCATION
22261 S MOUNTAIN HOUSE PKWY
RECEIVED_DATE
9/23/2022 12:00:00 AM
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\tsok
Supplemental fields
FilePath
\MIGRATIONS\M\MOUNTAIN HOUSE PKWY\22261\PA-0500838\SU0011925\BOS OK.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
123
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I -q <br />Pacific Gas and <br />Electric Company' <br />11. Cathodic Protection: PG&E pipelines are protected from corrosion with an "Impressed <br />Current" cathodic protection system. Any proposed facilities, such as metal conduit, pipes, <br />service lines, ground rods, anodes, wires, etc. that might affect the pipeline cathodic protection <br />system must be reviewed and approved by PG&E Corrosion Engineering. <br />12. Pipeline Marker Signs: PG&E needs to maintain pipeline marker signs for gas <br />transmission pipelines in order to ensure public awareness of the presence of the pipelines. <br />With prior written approval from PG&E Pipeline Services, an existing PG&E pipeline marker sign <br />that is in direct conflict with proposed developments may be temporarily relocated to <br />accommodate construction work. The pipeline marker must be moved back once construction is <br />complete. <br />13. PG&E is also the provider of distribution facilities throughout many of the areas within <br />the state of California. Therefore, any plans that impact PG&E's facilities must be reviewed and <br />approved by PG&E to ensure that no impact occurs which may endanger the safe operation of <br />its facilities. <br />PG&E Gas and Electric Facilities <br />Public <br />Page 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.