Laserfiche WebLink
I. All conditions of approval and all applicable impacts and mitigation measures identified <br /> in the SP III plan and SP III EIR are to be met prior to filing of any of the project's Final <br /> Maps unless specifically noted under a condition and shall be in compliance with the <br /> MHCSD standards and specifications and as directed by the MHCSD General Manager. <br /> The MHCSD General Manager may defer a condition if bonding is provided and it can <br /> be demonstrated to the satisfaction of the MHCSD General Manager that it is not <br /> required for the phase of Tract 3481 being developed. <br /> J. All public lands shown on the tentative map shall be dedicated or offered for dedication <br /> to MHCSD at the time of approval of the Final Map in accordance with the PLEP <br /> Ordinance, if applicable. <br /> K. All street sections shall meet all applicable State Fire Code requirements as determined <br /> by the MHCSD General Manager. <br /> L. Groundwater rights shall be dedicated to the MHCSD upon approval of Final Maps. <br /> M. Whenever all or any portion of a local or arterial street is constructed, the improvements <br /> shall include the installation of all streetlights. The Neighborhood lighting shall be <br /> provided as required by the MHCSD Design Manual and as determined by the General <br /> Manager. <br /> N. Restricted access shall be shown on the Final Map and shall be in accordance with the <br /> Master Plan, the Design Manual, and the MHCSD's Specifications and as determined by <br /> the General Manager. <br /> O. The developer shall prepare an SB 221 report to address the community's potable water <br /> supply needs prior to filing of any of the project's Final Maps. <br /> P. Recycling of construction wastes, such as wood and metal, shall be made part of the <br /> improvement plans and construction specifications for contractors in compliance with <br /> MHCSD requirements. Condition shall be met before approval of final maps. <br /> Q. The General Manager shall have the flexibility to implement alternative funding of the <br /> various improvements subject to existing agreements and ordinances. <br /> R. All residential buildings shall be wired per specifications in the"Low Voltage <br /> Construction Pre-wire Guidelines" and other specifications provided by the MHCSD. <br /> S. Lots C, D and E shall be eliminated and the property line on Lot G shall be aligned. <br /> T. Restricted access shall be provided on J Drive and all lots that side on H way and C <br /> Drive as determined by the MHCSD General Manager. <br /> U. The project shall comply with the Fire Protection Plan as determined and required by the <br /> MHCSD General Manger. <br /> V. Since Lots 1-31 do not have public street access, a Final Map for said lots shall not be <br /> recorded until public access is provided or adjacent property is developed which <br /> provides public access. <br /> 2. Record Drawings: Record Drawings shall be provided prior to acceptance of the <br /> improvements by the MHCSD. Record Drawings shall also be provided in digital format <br /> consistent with MHCSD File Format. <br /> 3. Final Mao Digital File: A digital file of the Final Map shall be submitted to the MHCSD and <br /> to the Community Development Department. The digital file format shall be consistent with <br /> 15 <br />