My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0006227
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MOUNTAIN HOUSE
>
22261
>
2600 - Land Use Program
>
PA-0600127
>
SU0006227
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/17/2019 12:22:30 PM
Creation date
9/6/2019 10:17:49 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0006227
PE
2620
FACILITY_NAME
PA-0600127
STREET_NUMBER
22261
Direction
S
STREET_NAME
MOUNTAIN HOUSE
STREET_TYPE
PKWY
City
MOUNTAIN HOUSE
ENTERED_DATE
8/29/2006 12:00:00 AM
SITE_LOCATION
22261 S MOUNTAIN HOUSE PKWY
RECEIVED_DATE
8/28/2006 12:00:00 AM
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Supplemental fields
FilePath
\MIGRATIONS\M\MOUNTAIN HOUSE PKWY\22261\PA-0600127\SU0006227\MISC.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
985
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
O. Masonry walls shall be installed at the property line between residential properties and <br /> all public c-private parcels. View Fencing or no fencing may be permitted in locations <br /> where residences face the Open Space as deemed appropriate by the MHCSD. Plans <br /> to be consistent with all Community Approvals including applicable provisions of the <br /> MHCSD Design Manual, MHCSD Standards, and any applicable Special Purpose Plan. <br /> Timing: Improvement Plans approved by CDD and MHCSD prior to first building permit. <br /> Walls or fencing may be constructed at the same time as house fencing. <br /> P. All landscape pedestrian through-block connections shall be a minimum of 30 foot width. <br /> Larger width may be required in specific areas as deemed necessary by MHCSD. <br /> Timing: prior to approval of the First Final Map. <br /> O. Pathways within pedestrian through-block connections or landscape corridor shall be a <br /> minimum of 8 foot width and shall be consistent with all Community Approvals including <br /> applicable provisions of the MHCSD Design Manual and MHCSD Standards. <br /> R. Community Wall alignments along Grant Line Road and De Anza Boulevard, adjacent to <br /> residential properties, shall undulate and shall be consistent with all Community <br /> Approvals including applicable provisions of the MHCSD Design Manual and MHCSD <br /> Standards. Property lines shall follow the alignment of the Community Walls. A <br /> continual five-foot maintenance easement shall be provided on the residential lot side of <br /> the community wall and shall be recorded with the final map. Timing: prior to First Final <br /> Map. <br /> S. Indicate all Landscape Setback areas within Commercial and Industrial zones as <br /> required by the Master Plan. Timing: prior to approval of the First Final Map. <br /> 33. A/B Neighborhood Parks: <br /> A. The neighborhood parks identified within Specific Plan III shall be dedicated to MHCSD <br /> or an offer of dedication to the MHCSD shall be recorded with the First Final Map. <br /> Timing: condition shall be met with approval of First Final Map of Neighborhood A/B. <br /> B. The entire A/B Neighborhood Park shall be designed consistent with all Community <br /> Approvals including applicable provisions of the Parks, Recreation and Leisure Plan and <br /> the MHCSD Design Manual. The design of the park shall be reviewed and approved by <br /> MHCSD. Timing: condition shall be met prior to approval of First Final Map. <br /> C. The MHCSD General Manager may allow the Neighborhood Park to be constructed in <br /> phases to be consistent with usage demand and other public interest considerations. <br /> Final design of the first phase of the Neighborhood Park shall be completed before its <br /> construction. Construction of the first phase of the neighborhood park shall begin no <br /> later than the time at which 50% of the dwelling units for Neighborhood A/B (separate <br /> from Neighborhood D)or school attendance area, whichever is sooner, have been <br /> issued a building permit. The Park shall be completed no later than the time at which <br /> 80% of dwelling units for the neighborhood have been issued building permits. <br /> Completion time may be modified by the MHCSD General Manager to reflect <br /> construction, weather, budget, or other public interest contingencies. <br /> D. A formal agreement for joint use of parks and recreation facilities with adjacent K-8 <br /> schools shall be required prior to construction of the park. (Implementation Measure <br /> 7.2.2.3d) <br /> E. Lot"S", portion of the A/B Neighborhood Park shall be constructed or bonded for at the <br /> discretion of MHCSD. Timing: construction shall begin prior to issuance of building <br /> permit of the 143d residential unit and the park shall be completed prior to issuance of <br /> building permit of the 228th residential unit. Completion time may be modified by the <br /> MHCSD General Manager to reflect construction, weather, budget, or other public <br /> interest contingencies. <br /> 26 <br />
The URL can be used to link to this page
Your browser does not support the video tag.