Laserfiche WebLink
00 <br /> o College Park at Mountain House Specific Plan III <br /> c o Mitigation Monitoring and Reporting Program <br /> =z g Mitigation Measure Timing/Schedule Implementation Implementation 8 Verification <br /> = Responsibility Action Dote Completed <br /> a <br /> oagreements for all habitable residential <br /> M structures to be located within 249 feet of <br /> a the PG&E/Chevron easement, and shall <br /> appear in all subsequent purchase and <br /> 0 <br /> rental agreements associated with these <br /> structuress. <br /> 4.10 BIOLOGICAL RESOURCES <br /> 4.10-2 Biological Resources—Conversion of Habitat Before construction San Joaquin <br /> for Special-Status Plants County, in <br /> The College Park developers shall request consultation with <br /> V coverage under the San Joaquin County Multi- SJCOG <br /> Species Habitat Conversation and Open Space <br /> Plan(SJMSCP), and the project applicants shall <br /> pay the SJMSCP impact fees determined by <br /> SJCOG during the application and review <br /> 3 process for each project under College Park. <br /> Suitable habitat for special-status plants that <br /> o. would be affected by implementation of College <br /> 3 Park is currently limited to the irrigation canals <br /> and ponds. Before implementation of each <br /> Tentatye Map (or of,individual development <br /> o projects if no Tentative Map),pre-construction <br /> Asurveys for special-status plants shall be <br /> o conducted by a qualified botanist in areas <br /> identified as suitable habitat by SJCOG at the <br /> appropriate time of year when the target species <br /> G would be in flower or otherwise clearly <br /> identifiable. Surveys shall be conducted in <br />