Laserfiche WebLink
3 r^ <br /> o `C <br /> o' College Park at Mountain House Specific Plan III <br /> 0 <br /> o Mitigation Monitoring and Reporting Program <br /> o' Implementation Implementation&Verification <br /> Mitigation Measure Timing/Schedule Responsibility Action Date Completed <br /> 0 <br /> a 4.10.5 Biological Resources—Conversion of Before construction San Joaquin <br /> oBurrowing Owl Foraging Habitat and Potential (surveys shall be County, in <br /> 3• Destruction of Active Burrows conducted 2 weeks consultation with <br /> The College Park developers shall request prior) SJCOG and DFG <br /> coverage under the SJMSCP,fees shall be paid <br /> 3 in the amount determined by SJCOG during <br /> the application and review process for each <br /> project under College Park, and if SJCOG <br /> determines suitable habitat is present on or <br /> adjacent to a given project site, the following <br /> SJMSCP incidental take avoidance and <br /> c minimization measures shall be implemented: <br /> Burrowing owls shall be discouraged from <br /> entering or occupying construction areas by <br /> employing one of several methods outlined <br /> in Section 5.2.4.15 of the SJMSCP. These <br /> indude retention of tall vegetation, regular <br /> discing of the site, or use of chemicals or <br /> traps to kill ground squirrels; <br /> Pre-construction surveys for burrowing owls <br /> shall be conducted where project <br /> o construction activities would occur within 75 <br /> o meters of suitable habitat(based on SJCOG <br /> = review). The survey shall be conducted <br /> o within 2 weeks of the beginning of <br /> construction. If burrowing owls are found, <br /> the following measures shall be <br /> r implemented: <br /> During the nonbreeding season <br /> (September I through January 31), , <br />