My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0006227
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MOUNTAIN HOUSE
>
22261
>
2600 - Land Use Program
>
PA-0600127
>
SU0006227
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/17/2019 12:22:30 PM
Creation date
9/6/2019 10:17:49 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0006227
PE
2620
FACILITY_NAME
PA-0600127
STREET_NUMBER
22261
Direction
S
STREET_NAME
MOUNTAIN HOUSE
STREET_TYPE
PKWY
City
MOUNTAIN HOUSE
ENTERED_DATE
8/29/2006 12:00:00 AM
SITE_LOCATION
22261 S MOUNTAIN HOUSE PKWY
RECEIVED_DATE
8/28/2006 12:00:00 AM
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Supplemental fields
FilePath
\MIGRATIONS\M\MOUNTAIN HOUSE PKWY\22261\PA-0600127\SU0006227\MISC.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
985
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3 r^ <br /> o `C <br /> o' College Park at Mountain House Specific Plan III <br /> 0 <br /> o Mitigation Monitoring and Reporting Program <br /> o' Implementation Implementation&Verification <br /> Mitigation Measure Timing/Schedule Responsibility Action Date Completed <br /> 0 <br /> a 4.10.5 Biological Resources—Conversion of Before construction San Joaquin <br /> oBurrowing Owl Foraging Habitat and Potential (surveys shall be County, in <br /> 3• Destruction of Active Burrows conducted 2 weeks consultation with <br /> The College Park developers shall request prior) SJCOG and DFG <br /> coverage under the SJMSCP,fees shall be paid <br /> 3 in the amount determined by SJCOG during <br /> the application and review process for each <br /> project under College Park, and if SJCOG <br /> determines suitable habitat is present on or <br /> adjacent to a given project site, the following <br /> SJMSCP incidental take avoidance and <br /> c minimization measures shall be implemented: <br /> Burrowing owls shall be discouraged from <br /> entering or occupying construction areas by <br /> employing one of several methods outlined <br /> in Section 5.2.4.15 of the SJMSCP. These <br /> indude retention of tall vegetation, regular <br /> discing of the site, or use of chemicals or <br /> traps to kill ground squirrels; <br /> Pre-construction surveys for burrowing owls <br /> shall be conducted where project <br /> o construction activities would occur within 75 <br /> o meters of suitable habitat(based on SJCOG <br /> = review). The survey shall be conducted <br /> o within 2 weeks of the beginning of <br /> construction. If burrowing owls are found, <br /> the following measures shall be <br /> r implemented: <br /> During the nonbreeding season <br /> (September I through January 31), , <br />
The URL can be used to link to this page
Your browser does not support the video tag.