Laserfiche WebLink
3 ^+ <br /> o �t <br /> -o' College Park at Mountain House Specific Plan III <br /> o Mitigation Monitoring and Reporting Program <br /> Mitigation Measure Timing/Schedule Implementation Implementation&Verification <br /> Responsibility Action Date Completed <br /> 0 <br /> ASJCOG during the application and review <br /> o process for each project under College Park. <br /> Potential nest sites for all tree-nesting <br /> species are scattered throughout much of <br /> the College Park site, but are concentrated <br /> along Grant Line Road and at Grant Line <br /> Village. Suitable nesting habitat for <br /> northern harrier is provided by all field <br /> crops and fallow Fields. During the SJMSCP <br /> application process, SJCOG will determine <br /> whether that specific project site supports <br /> ^' suitable nesting habitat. If SJCOG <br /> determines suitable habitat is present on or <br /> adjacent to a given project site, the SJMSCP <br /> incidental take avoidance and minimization <br /> measures described below for nesting <br /> raptors shall be implemented.Additional <br /> measures below shall be implemented to <br /> avoid loss of active nests of common raptor <br /> species,which are not covered under the <br /> SJMSCP but are protected under the <br /> oCalifornia Fish and Game Code. The <br /> e project applicants shall retain qualified <br /> = biologists to conduct all pre-construction <br /> 0 <br /> o = surveys. <br /> � m <br /> o` v White-tailed Kite. If project construction <br /> �• begins during the nesting season (February <br /> 0 0 15—September 15), pre-construction surveys <br /> shall be conducted to investigate all <br /> potential nesting trees on the project site <br />