Laserfiche WebLink
3 ^' <br /> a <br /> o � <br /> o College Park at Mountain House Specific Plan III <br /> a Mitigation Monitoring and Reporting Program <br /> o Implementation Implementation&Verification <br /> Mitigation Measure Timing/Schedule onsihili <br /> 0 <br /> P N Action Date Completed <br /> Res <br /> a Joaquin Kit Fox before or during Ground <br /> a Disturbance (US Fish and Wildlife Service <br /> ZL [FWS] 1999b) shall apply (except that pre- <br /> construction survey protocols shall remain as <br /> established in the above paragraph). These <br /> 3 standards include provisions for educating <br /> construction workers regarding the kit fox, <br /> keeping heavy equipment operating at safe <br /> speeds, checking construction pipes for kit <br /> fox occupation during construction, and <br /> similar low- or no-cost activities. <br /> m 4.10.10 Biological Resources—Loss or Alteration of Before construction San Joaquin <br /> Jurisdictional Waters of the United States County, in <br /> Impacts to waters of the United States are not consultation with <br /> currently mitigated by participation in the USACE and/or <br /> SJMSCP. Therefore, the College Park developers RWQCB, and DFG <br /> shall implement the following measures: <br /> Before implementation of any Tentative Map <br /> or development project(if no Tentative Map) <br /> under the College Park project, a formal <br /> Section 404 delineation of waters of the <br /> 3 <br /> United States, including wetlands, shall be <br /> conducted by a qualified biologist in the <br /> N a Tentative Map or development project area <br /> if the area includes features that are <br /> g`f potentially subject to United States Army <br /> a Corp of Engineers (USACE)jurisdiction <br /> o^ o (ponds, irrigation canals, and drainages). <br /> The delineation shall be submitted to USACE <br /> for verification. <br />