Laserfiche WebLink
3 ^� <br /> o ZE <br /> c College Park at Mountain House Specific Plan III <br /> oMitigation Monitoring and Reporting Program <br /> Implementation Implementation&Verification <br /> Mitigation Measure Timing/Schedule <br /> Responsibility Action Date Completed <br /> e <br /> a Agricultural Activity, Industrial,and Before construction Developer, in <br /> o Commercial Noise. Before the approval of consultation with a <br /> building permits for each individual qualified acoustical <br /> subdivision, SJCCDD shall evaluate the consultant <br /> S building permits for compliance with the San <br /> 3 Joaquin County Development Title. Where <br /> individual projects do not clearly comply <br /> with interior noise standards included in <br /> these guidelines, mitigation measures such as <br /> use of dual-pane windows, mechanical air <br /> systems, exterior wall insulation,and other <br /> a noise-reducing building materials and <br /> methods shall be required as appropriate to <br /> reduce interior noise exposure to 45 dBA <br /> Ldn (Table 4.13-3 of the EIR). Where <br /> individual projects do not clearly comply <br /> with exterior noise standards of the San <br /> Joaquin Development Title (Table 4.13-3 of <br /> the EIR), mitigation measures, such as use of <br /> noise barriers, buildings for screening, and <br /> g setbacks between noise sources and <br /> PC receptors, shall be implemented as <br /> 3 appropriate to minimize exterior noise levels. <br /> = Where there is a question regarding pre- <br /> mitigation or post-mitigation noise levels in <br /> 8 an area, site-specific noise studies may be <br /> �• conducted to determine compliance or <br /> ca noncompliance with County guidelines.Any <br /> and all noise studies and mitigation required <br /> by the above shall be fully funded by the <br />