Laserfiche WebLink
m o <br /> CD <br /> m College Park at Mountain House Specific Plan III <br /> . d Mitigation Monitoring and Reporting Program <br /> 5 <br /> 0 Implementation Implementabon&Verification <br /> Mitigation Measure Timing/Schedule <br /> Responsibility Action Date <br /> = Completed <br /> �• employing one of several methods outlined in <br /> o Section 5.2.4.15 of the SJMSCP. These include <br /> y retention of tall vegetation,regular discing of the <br /> CD site, or use of chemicals or traps to kill ground <br /> Cn <br /> squirrels; <br /> ► Pre-construction surveys for burrowing owls <br /> shall be conducted where project construction <br /> w activities would occur within 75 meters of <br /> suitable habitat(based on SJCOG review).The <br /> survey shall be conducted within 2 weeks of the <br /> beginning of construction.If burrowing owls are <br /> found,the following measures shall be <br /> implemented: <br /> During the nonbreeding season(September I <br /> through January 31),burrowing owls <br /> occupying the project site shall be evicted <br /> from the project site by passive relocation, as <br /> g <br /> described in the DFG's Staff Report on <br /> Burrowing Owls(DFG 1995). <br /> m <br /> o During the breeding season(February 1 <br /> through August 31),occupied burrows shall <br /> 0 not be disturbed and shall be provided with a <br /> 0 250-foot protective buffer until and unless <br /> the Technical Advisory Committee,with the <br /> concurrence of the permitting agencies' l <br /> o representatives on the Technical Advisory <br /> CD Committee,or a qualified biologist approved <br /> $ by the permitting agencies,verifies through <br /> noninvasive means that either(1)the birds <br /> -a have not begun egg laying or(2)juveniles <br /> rno from the occupied burrows are foraging <br /> 3 :I> independently and are capable of <br /> independent survival.After the fledglings <br />